STATE HOURS/MATERIALS 2015 <br /> *No work done on 6th or 7th due to LTD/Emx project <br /> Scott-3 people (1 FTE, 2 Seasonals), 2 trucks (304064,504030)= 33.5 hrs <br /> 6/22/15= lhr <br /> 7/6/15=4hrs <br /> 7/7/15= 10hrs <br /> 7/8/15=7.5hrs <br /> 7/13/15=3hrs <br /> 7/14/15=4hrs <br /> 7/15/15=4hrs <br /> st' <br /> 12" x-walk= 1544' replacing 49 <br /> 12" Stop bars= 151' replacing 14 <br /> 4" Cat track white= 194' replacing 10 <br /> 4" Cat track yellow=30' replacing 1 <br /> Mark-2 people (1 FTE, 1 Seasonal), 1 truck (504030) =3 hrs <br /> 6/23/15= 0.5hr <br /> .y / <br /> 6/24/15= 1.5hr <br /> 6/25/15= 1hr <br /> Left arrow=2 <br /> Left opt= 1 <br /> Right opt= 1 <br /> Y and 0= 1 each <br /> 12" White Line=36' <br />