New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
October 2003 News Coverage
COE
>
PW
>
POS_PWM
>
Parks
>
News Coverage
>
October 2003 News Coverage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2015 2:56:47 PM
Creation date
9/23/2015 2:56:21 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2016
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Public can participate <br /> in playground designing <br /> The public can help create <br /> two new regional playgrounds <br /> —each larger than any in the <br /> Eugene area—during a work- <br /> shop Wednesday from 6 p.m.to <br /> 8:30 p.m.at the Campbell Se- <br /> nior Center,155 High St.in Eu- <br /> gene. <br /> The playground project, <br /> called RiverPlay,will result in <br /> a large new playground in <br /> Skinner Butte Park and anoth- <br /> er in Alton Baker Park.Each <br /> will contain unique new play <br /> equipment.Parents are en- <br /> couraged to bring their chil- <br /> dren to help in Wednesday's <br /> design project. <br /> fir• The playgrounds are a <br /> project of the Eugene Lions <br /> Club,Eugene Active 20/30 <br /> Club and the Eugene Down- <br /> town Rotary Club,with fund- <br /> ing from a parks and open <br /> space bond measure voters ap- <br /> proved in 1998.More informa- <br /> tion is available by phoning <br /> 682-4915 or e-mailing <br /> rob in.a.hostick@ci.eugene.or: <br /> us. <br /> 12e fir-Guard <br /> Sunday. October 5.7003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.