I-5 bridge work goes into high gear- The Register-Guard, Eugene, Oregon, USA Page 1 of 3 <br /> www.registerguard.com I ©The Register-Guard, Eugene,Oregon <br /> i <br /> 1'11110' October 13, 2003 <br /> I-5 bridge work goes into high gear <br /> By Bill Bishop <br /> The Register-Guard <br /> Like a construction video on fast-forward, local motorists will <br /> see detour bridges go up on Interstate 5 over the Willamette <br /> and McKenzie rivers in the next year as transportation officials <br /> scramble to return heavy-haul trucking to the state's main <br /> north-south freeway. <br /> Crews working for Hamilton Construction Co., a longtime <br /> Springfield-based bridge builder, have begun work on a <br /> temporary bridge over the Willamette and are aiming to finish <br /> detour bridges over both rivers by Sept. 5 next year, said Jeff <br /> Payne, <br /> Oregon Department of Transportation project manager. <br /> It should be quite a show, he I <br /> said. Public tours of the projects <br /> will be held on the first <br /> Thursday of each month. <br /> "We're going to do four years of <br /> work in one," he says. "There is <br /> nothing complex about the <br /> structure. It's the length of it. It <br /> is one of the longest structures <br /> in Oregon. The crossings of the <br /> Columbia River are about the <br /> only things that top it." <br /> Because the Willamette detour 691114 <br /> bridge requires 56 pilings - most <br /> of them drilled and poured into —J�-- <br /> bedrock beneath the river - <br /> crews will have to take special _ v <br /> steps to guard against pollution <br /> as the holes are drilled and filled <br /> with reinforced concrete for <br /> support pillars that are 7 feet in <br /> diameter. <br /> Jack Young, a pile buck supervisor, <br /> Crews probably will work 12- guides a pile driver with a rope as <br /> hour days Mondaythroughcrews prepare to build an I-5 detour <br /> y bridge over the Willamette River. <br /> Friday and 10 hours on <br /> Saturdays. About 300 Photos: Thomas Boyd /The <br /> truckloads of fill dirt will arrive Register-Guard <br /> http://www.registerguard.com/cgi-bin/printStory.py?name=a 1.bridges.1013&date=20031013 10/17/03 <br />