New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
October 2003 News Coverage
COE
>
PW
>
POS_PWM
>
Parks
>
News Coverage
>
October 2003 News Coverage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2015 2:56:47 PM
Creation date
9/23/2015 2:56:21 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2016
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/ EUGENE — — <br /> October 29, 2003 <br /> CONTACT: <br /> • John Weber, Parks and Open Space Planner, 682-4908 <br /> • Therese Picado, Parks and Open Space Public Information Specialist, 682-4814 or 682- <br /> 4800 <br /> FOR IMMEDIATE RELEASE <br /> CANDLELIGHT PARK NEIGHBORS INVITED TO HELP DESIGN NEIGHBORHOOD PARK <br /> Neighbors of all ages are invited to share their vision for Candlelight Park, an 11.2-acre, <br /> undeveloped neighborhood park located north of Royal Avenue and west of Candlelight. The <br /> meeting, which is the first in a series of public workshops, will take place on Wednesday, <br /> October 29, from 7 to 9 p.m. at Petersen Barn, 870 Bertzen in the Bethel area. <br /> The goal of the first meeting is for City parks planners to gather input from residents <br /> about their vision for the park. The park, which is surrounded by a new subdivision under <br /> construction and older, established neighborhoods, currently consists of a large, open field with <br /> an open drainage way that runs through it. The field has been used informally as an off-leash <br /> dog area. <br /> A master plan will be drafted after the initial meeting and subsequent public meetings <br /> held to gather more input from neighbors and refine the park plan. Construction of the park is <br /> anticipated to start in 2005. Improvements will be funded in part by the parks and open space <br /> bond measure voters approved in 1998. For more information, call 682-4908 or e-mail <br /> john.j.weber@ci.eugene.or.us. <br /> # ## <br /> I <br /> t. <br />
The URL can be used to link to this page
Your browser does not support the video tag.