New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Corps G I Study 2002
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Corps G I Study 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2015 11:17:30 AM
Creation date
9/11/2015 11:17:26 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2016
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
..;T OF, <br /> r ..'t-. d, DEPARTMENT OF THE ARMY <br /> PORTLAND DISTRICT.CORPS OF ENGINEERS <br /> r <br /> P.O. BOX 2946 <br /> PORTLAND.OREGON 97208-2946 <br /> 70 <br /> A 0 <br /> :•` � <br /> ATTENTION OF: 3 0 AUG 1002 C.) k). <br /> Planning, Programs and <br /> Project Management Division <br /> Kurt Corey • <br /> Director, Dept. of Public Works <br /> 858 Pearl Street <br /> Eugene,Oregon 97401 <br /> Dear Mr. Corey: <br /> As previously coordinated with Scott Duckett and Bud DeSantis,of your staff,the <br /> enclosed Task Order 02-02 for Services and/or Supplies is provided for your signature. The Task <br /> Order was prepared in accordance with the Cooperative Agreement Amendment No. 1,dated <br /> September 28,2001,between the U.S. Army Corps of Engineers,Portland District,and the City <br /> of Eugene for the collection of native plant materials for the construction of recreation facilities at <br /> Amazon Creek Section 1135 Project. <br /> Under the Cooperative Agreement,the City of Eugene may construct recreation facilities <br /> associated with the Project. The Corps of Engineers agrees to reimburse the City of Eugene for <br /> the Federal share of costs. In summary,the City Eugene and the Corps of Engineers will share <br /> the total costs for planning,design,engineering and construction of the recreation facilities. The <br /> currently estimated total project cost is approximately$1,200,000. The Federal share for <br /> recreation facilities,however, is capped at 10 percent of the Federal share for the ecosystem <br /> restoration costs of the Section 1135 project,currently estimated at$410,900. To date,the Corps <br /> of Engineers has expended approximately$184,000 for planning, engineering and design of <br /> recreation facilities. Therefore, a maximum of$226,900 is available for reimbursement of <br /> recreation facilities construction costs. For FY 2002, an initial $200,000 has been allocated. <br /> The balance will be allocated in FY 2003. <br /> If the Task Order is acceptable,please sign and return it as soon as possible to the address <br /> above. If you have any questions about the agreement or the task order,please contact our <br /> Project Manager,Matthew Rea,at(503) 808-4732. <br /> Sincerely, <br /> 0 <br /> Davis Moriuc i <br /> Deputy District Engineer <br /> for Project Management <br /> Enclosure <br /> MFR: A Cooperative Agreement Determination of Findings (DOF) Form is enclosed for <br /> signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.