New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Amazon Channel - Storm Sewer
COE
>
PW
>
POS_PWM
>
Parks
>
Stormwater
>
Amazon Channel - Storm Sewer
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2015 11:12:53 AM
Creation date
9/11/2015 11:12:06 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2016
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11;04/98 17:53 $541 682 4099 LCOG PSB e1002 <br /> 11-/0Z/8.'S MON 15:23 FAX 5032224292 WOODWARD CLYDE -s-.-+ EMENE CLIENT 1002 <br /> CIP Fact Sheet Information For Amazon Basin <br /> This tact Sheet Form Is for CIP # AM06 <br /> CIP Identifier IAMO6 <br /> Street Identifier <br /> Staff's Name developing the CIP &'hong <br /> Peer Reviewer's Name <br /> Pesr.Reviewer Date ,.._ <br /> if the CIP Is Flnlsncd <br /> CIP Location <br /> This CIP Is In Amazon Headwaters Sub-basin,Iust north of Mortln Dr.In Kinney Pork between <br /> W.Amazon Parkway and Center Way(sewer mop Index page 71) <br /> C15 U/S Node Localion 6634' <br /> GIS D/S Node Location � 653821 <br /> Drainage Area 372 Acres <br /> % Ihlitiervious (ExMnO) 9 <br /> % Impervious (Future) 32; <br /> Problems and/or Opportunities Addressed by the CIP <br /> PrcabPOrns <br /> Segment AMI-M/0108 In the piped storm system which runs west beneath Martin Dry and <br /> dlschorges Isle lila Amazon Creek is aspected to be awficierrt for a 10-year storm under <br /> future build-out conditions. segment aiv1HW0108 Ino 352 ft king 48'CSP and has a <br /> tbpasfty of 150 Cfs. The predicted future 10-year flow Is 170 cts(13%above design <br /> capacity). <br /> Opportunllles <br /> lOportunity to restore flow to the hlstarioal open channel to nileviate coponity prob{em In <br /> the pipe segritier t AMHWOI06. Open space adjacent to the drainage system In Kinney <br /> Paris provides an opportunity to construct a neighborhood water quality facility. <br /> I:\proJ94\945042nd\rasl300\procip.mdb Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.