3E.1\I DI • .__... - - <br /> April 28, 1992 ".=ARCHITECTS.1n.CORPORATE.D, <br /> • <br /> Archiectute. °r.•• • <br /> Planning <br /> Urban Design' <br /> Mr. Doug Weber Develgpn•••. •Services. <br /> • <br /> City of Eugene <br /> • <br /> Landscape Architecti(ie- <br /> Public Works Department • ;`. <br /> Clvif.Engineerin�;�::••••• <br /> 858 Pearl Street <br /> 3ransportEitiCi!1''•� '�'',-,::. <br /> Eugene, Oregon 97401 <br /> EnvironrtientaI 5orvices. <br /> mt n n Water Resour. • .• • <br /> Re: Amazon Channel Mst e a c 5tudv - •,R <br /> • <br /> Project Number L3858.WOO Survo'ing . <br /> • <br /> Dear Mr. Weber: <br /> The attached report documents the results of the above referenced study. It is our belief <br /> that the maintenance scheduled for this summer on the channel from the SPRR crossing to <br /> Beltline can be delayed at least one year, with minimal risk of additional flooding should <br /> the 100-year flood occur this next winter. This maintenance reprieve will provide the City _�,"� =+ <br /> with the time needed to implement the recommendations of our study and more closely <br /> examine the risk of flooding and the feasibility of using alternative channel maintenance :t •' '�:.:� .= ; <br /> procedures. If you have any questions, please give me a call. <br /> Sincerely, <br /> Roger C. Sutherland, P.E. <br /> Senior Water Resources Engineer j :,•:;:, <br /> RCS/res <br /> • <br /> Attachment <br /> • . <br /> a. •z <br /> • <br /> 17-368 Sw.eaonas r••Kty Rod.. <br /> t hkn O5*ego.Oregon 97036.'? <br /> -.(603)635-36t - <br /> -,;Psx.(.:03)6396 <br /> 'libX)41,0.Wasntnypn 96033' <br /> 12001 822-4446 <br /> Fax(209)827.9677 ' <br />