I am trying to reconcile a couple of my POs to Webtots and the very first one I came to was over on the PO by$3500 <br /> from webtot information. In researching, there was a change order done on 6/29 with two lines; one for 10k(in <br /> webtots) and one for$3500 (not in webtots). Can you help me understand why this may have happened and maybe fix <br /> it if it needs fixing? <br /> PO 2012100459 <br /> CO#8 <br /> 011-9642-61739 <br /> See attached. <br /> Victoria Doyle,AIC Contract Administrator <br /> victoria.m.doyle(aci.eugene.or.us <br /> Parks&Open Space/Maintenance <br /> City of Eugene Public Works <br /> 1820 Roosevelt Blvd.,Eugene OR 97402 <br /> phone:(541)682-4966-fax:(541)682-4882 <br /> 5 <br />