New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
February 2003
COE
>
PW
>
POS_PWM
>
Parks
>
News Coverage
>
February 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 1:04:00 PM
Creation date
8/19/2015 1:02:37 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
Fiscal_Year
2016
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Office at 682-5411. <br /> Busy Week in the `Hoods' <br /> 'le second week of the month is always a busy time for the Neighborhood Associations. Eight groups held General or <br /> `steering Committee meetings on Monday, Tuesday, or Wednesday nights. All told, almost 330 neighbors participated in <br /> these meetings! <br /> Over 120 people attended the River Road Community Organization's forum on railroad pollution Monday evening. The <br /> forum featured speakers from the Department of Environmental Quality and the Oregon Toxic Alliance. Across town, on <br /> Tuesday night, over 100 neighbors attended the Fairmount Neighbors General meeting. The University's plans for East <br /> campus and the Walnut node proposal were the main topics discussed. <br /> In addition to these meetings, about 50 neighbors attended a Southeast Neighbors meeting to discuss the Natural <br /> Resources Study; approximately 25 neighbors at Jefferson Westside talked about possible alternative uses of the <br /> Fairgrounds; 12 neighbors in Whiteaker debated the River Road Node and the WEP; about 15 neighbors in Amazon <br /> shared a delicious Valentine potluck; and the boards of Friendly Area Neighbors and Downtown Neighbors attended to <br /> business. For more information, please contact Beth Bridges, Planning and Development, at 682-5272 or via e-mail <br /> beth.b.bridges@cieugene.or.us. <br /> Union Pacific Railroad Schedules Crossing Upgrades <br /> The Union Pacific Railroad is in the process of improving its network of tracks through the Eugene area. Railroad crews <br /> are currently pulling up existing tracks and railroad ties and replacing pieces as needed. In Eugene, 10 streets will be <br /> affected, one at a time, as Union Pacific makes the needed improvements to its crossings. Work at these crossings will <br /> require full closures for two to four days each, depending on whether there is one track involved or two. The railroad <br /> expects to begin its work at the crossings by early March. Work will involve removing a section of the pavement or the <br /> existing rubberized treatments which are located at the approach to the tracks from each direction. To meet current <br /> `andards, existing crossing surfaces will be replaced with pre-formed concrete slabs. All current ADA standards are <br /> ..atisfied by this crossing upgrade. <br /> Union Pacific's current plan is to move from east to west, with the first crossing location being at East Eighth Avenue and <br /> Hilyard Street. Subsequent work will take place at High Street(at East 5th Avenue), then at Pearl, Lincoln, Lawrence, <br /> Washington, Jefferson, Madison, Monroe and, finally,the Van Buren street crossing. The work effort will then move on <br /> to county crossings, starting with Irving Road, and proceeding north toward Junction City. <br /> Traffic control plans will be submitted in advance to Public Works Transportation for review and approval. The railroad <br /> intends to position solar-powered variable message boards approximately 48 hours prior to each crossing closure to warn <br /> the public of the impending detour. For more information, please contact Jay Millikin at 682-5271, or email <br /> jay.millikinQci.eugene.or.us. <br /> Carpet Cleaning Professionals and City Form Partnership to Protect Water Quality <br /> A new partnership program with local carpet care professionals and the City's <br /> gin <br /> Stormwater Management program focuses on a commitment to protect local <br /> WIER waterways while promoting environmental stewardship. The Clean Water Business <br /> Program is modeled after a successful program in Sacramento, California that works in <br /> us= conjunction with participating carpet care businesses. <br /> d PARTNER�,.r N+� Prior to starting the program here, members of the City's stormwater staff met with <br /> several carpet care experts to get their input and determine how to create an effective <br /> program in Eugene. The program is educational and voluntary and does not impose more regulations. Participating <br /> partners and their staff attend an educational workshop that reviews stormwater pollution issues and best management <br /> (116.- <br /> EUGENE <br /> EUGENE CITY COUNCIL NEWSLETTER PAGE 3 <br /> February 14,2003 cc021303.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.