New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Road Repairs Affect Traffic on East 40th, Donald Street
COE
>
PW
>
Admin
>
Public Affairs
>
2015
>
Road Repairs Affect Traffic on East 40th, Donald Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2015 2:10:48 PM
Creation date
7/28/2015 2:10:47 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
Engineering
PW_Subject_Public_Affairs
Road Repairs
External_View
No
PWA_Release_Date
7/28/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br />July 28, 2015 <br /> <br />CONTACT: Teri Higgins, Project Manager, 541-682-8462 <br /> <br />From Public Information Section, 541-682-5523 or 541-954-2938 <br /> <br />FOR IMMEDIATE RELEASE <br /> <br /> <br />Road Repairs Affect Traffic on East 40, Donald Street <br />th <br />Starting Thursday, paving repairs will limit traffic on portions of East 40 Avenue and <br />th <br />Donald Street. <br />Milling and paving work on East 40 Avenue from Hilyard to Donald streets is expected to <br />th <br />be completed on Thursday. While work is under way, that section of 40 will be closed to <br />th <br />eastbound traffic. A single lane will be maintained for westbound traffic. However, motorists are <br />encouraged to use East 39 or alternate routes. <br />th <br />More extensive repairs are planned for Donald Street. Starting Thursday afternoon and <br />continuing for about a week, Donald Street will be closed to northbound traffic at 33 Avenue as <br />rd <br />crews from Eugene Sand and Gravel, working under contract to Eugene Public Works, repair and <br />repave Donald Street from Willamette Street to 33 Avenue. <br />rd <br />That will be followed by complete reconstruction of Donald Street from 33 to 40 avenues. <br />rdth <br />Crews will excavate the roadway, rebuild the road base using an in-place cement treatment, and <br />then apply a new asphalt surface. Work will be completed in three phases with each phase closing <br />sections of Donald to all traffic. Detours will be in place. Donald is expected to be reopened from <br />Willamette to 40 by early September. <br />th <br />Estimated cost of the two street repair projects is approximately $2.3 million. Primary <br />sources of funding are the voter-approved 2012 bond measure to fix city streets and Eugene’s 5- <br />cent-per-gallon local gas tax. <br />Watch for signs and cones directing traffic in work zones. Use alternate routes to avoid <br />delays and detours. For more information about the projects and for the latest updates on traffic <br />impacts, go to www.eugene-or.gov/traffic or follow EugenePW on Twitter. <br /># # # <br /> <br />Public Works Administration ● City of Eugene ● 101 E. Broadway, Suite 400, Eugene, OR 97401 <br />Phone 541-682-8421 ● Fax 541-682-6826 ● www.eugene-or.gov/pw <br />
The URL can be used to link to this page
Your browser does not support the video tag.