I'm attaching a spreadsheet of some hours I spent on the Bl.M grant—these were after the grant was awarded but <br /> before we had a code in place. Is it possible to do a journal entry(if that is the correct action) to have these hours <br /> associated with match to our grant (535-9630-216990-000)? They could be switched from REG (work type 310 or 323) <br /> on my timesheet. <br /> Thanks, <br /> Emily <br /> Emily Steel, Ecologist <br /> Natural Areas and Urban Forestry <br /> 541.682.4874 <br /> 2 <br />