New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Block on 19th Avenue Closed for Repairs March 30-April 6
COE
>
PW
>
Admin
>
Public Affairs
>
2015
>
Block on 19th Avenue Closed for Repairs March 30-April 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2015 1:54:57 PM
Creation date
3/25/2015 1:54:56 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
Maintenance
PW_Subject_Public_Affairs
Road Repairs
External_View
No
PWA_Release_Date
3/25/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br />March 25, 2015 <br /> <br />CONTACT: Rob Brooks, PWM Street Surface Team Lead Worker, 541-915-2554 <br /> <br />From Public Information Section, 541-682-5523 or 541-954-2938 <br /> <br />FOR IMMEDIATE RELEASE <br /> <br /> <br />Block on 19 Avenue Closed for Repairs March 30-April 6 <br />th <br />Beginning March 30, a one-block section of 19 Avenue between Hilyard and Patterson <br />th <br />streets will be closed to through traffic for approximately one week as crews from Eugene Public <br />Works repair the deteriorated concrete street. <br />Public Works crews have been working in east and southeast Eugene for several months <br />repairing failed concrete panels. The crews focus on concrete repairs during late winter and early <br />spring because much of the work can be done even when the weather is cool and rainy. Asphalt <br />street repairs, which require warm and dry weather, typically are done in the summer and early <br />fall. <br />The work scheduled on 19 Avenue includes curb-to-curb concrete replacement of a <br />th <br />portion of the block immediately to the east of South Eugene High School. This will require the <br />closure of both traffic lanes and the LTD bus stops on both sides of the street. Patterson and Hilyard <br />streets will remain open although motorists in that area may encounter heavy truck traffic and <br />minor delays. To ensure that the concrete cures to the proper strength, the street will remain closed <br />until Monday morning on April 6. <br /> For updates on this and other local street repair projects, go to www.eugene-or.gov/traffic <br />or follow Public Works on Twitter at EugenePW. <br /># # # <br /> <br /> <br />Public Works Administration ● City of Eugene ● 101 E. Broadway, Suite 400, Eugene, OR 97401 <br />Phone 541-682-8421 ● Fax 541-682-6826 ● www.eugene-or.gov/pw <br />
The URL can be used to link to this page
Your browser does not support the video tag.