New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Vegetation (2)
COE
>
PW
>
POS_PWM
>
Parks
>
Miscellaneous
>
Vegetation (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2014 10:51:32 AM
Creation date
10/17/2014 10:47:42 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Identification_Number
Medlin Veg Folder
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROPOSAL 3: The City of Eugene should examine methods to process the <br />weed mowing program billing statements in a more timely manner. The <br />current problems caused by the billing delays that have been charac- <br />teristic of the program were mentioned previously. Following are <br />some potential remedies for this situation: <br />1. examine the possibility of the Public Works Department <br />entering their weed mowing work orders onto their Wang <br />computer. The advantage of this procedure would be that <br />all invoices could be immediately generated on completion <br />of a pre- entered work order with dollar amounts needing <br />to be entered upon completion. This would eliminate a <br />much slower manual method and would be the first step <br />toward a faster billing process; and <br />2. examine the possibility of the Public Works Department <br />mailing the weed mowing billing statements (invoices) <br />instead of routing them through the Finance Department. <br />This would eliminate the slow inter - departmental trans- <br />ferring process. The Public Works Department would be <br />responsible for a second copy of the invoice reaching <br />the Finance Department. Reducing the time interval <br />between the actual mowing and the billing date could <br />improve our collection rate. There would be less <br />chance of properties changing ownership during the <br />interim. There would be a greater likelihood of <br />successfully pursuing delinquent accounts because the <br />mowing would remain evident for a much longer period <br />of time after the billing date than is currently the <br />case. Also, reaching customers when the service pro- <br />vided is still fresh in their minds could be of benefit. <br />As a final note, the Eugene City Code requires that the invoices <br />notify recipients of their right to protest the mowing fees up <br />to 10 days after the billing date. The invoices do not currently <br />include this information and should do so in the future. <br />PROPOSAL 4: The City of Eugene should examine the possibility of <br />prosecuting chronic abusers of the weed mowing program. <br />There are some individuals whose properties are affected by the weed <br />mowing program year after year and have never shown any indication of <br />ever paying any of the fees. In special cases as these and also large <br />accounts with a high overhead to the City, a judgement might be sought <br />in Small Claims Court. The possibility exists for the City to itself <br />affect the proceedings or to enlist the aid of a collection agency. <br />The cost effectiveness between the two would require further analysis. <br />This proposal is not meant to provide a means for recovering vast <br />revenues. It is questionable as to whether or not we would even <br />break even, but it would serve notice that the City is no longer <br />willing to stand idle in cases of flagrant abuse of the weed <br />mowing service. The impact of this proposal on compliance might <br />reduce the percentage of unpaid fees and is expected to be cost - <br />justified if applied in a reasonable manner. <br />=J- <br />
The URL can be used to link to this page
Your browser does not support the video tag.