September 10, 1987 <br />1. Update Weed Brochure <br />2. Determine Public Works /Parks role <br />3. Develop a written policy for vegetation <br />4. Cost vs. Revenue analysis <br />5. Reduce number of liens <br />6. Sign inspection done by May 1st (Traffic) <br />7. Turnaround time <br />8. Peak Workload <br />Begins - May 1st <br />Peaks - Mid July <br />Finish - September 1st <br />9. Update nuisance matrix <br />10. Who should be doing what pieces of vegetation program <br />11. Evaluate billing methodology <br />Wang Equipment to be transferred? <br />12. Establish a priority system for complaints <br />13. Staff /public education <br />14. Develop flow chart of existing program <br />15. Identify resources to be transferred (FTE, Vehicle, Extra Help, <br />Contractual Service) <br />16. Identify where program is placed in Maintenance <br />17. Finance wish list *us gr fncag001 <br />wmseumtg <br />