New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
4J Stadium, Through May 1999
COE
>
PW
>
POS_PWM
>
Parks
>
Miscellaneous
>
4J Stadium, Through May 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2014 1:47:14 PM
Creation date
10/16/2014 11:23:51 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
n ' <br /> PROPOSES BALLFIELD UPGRADE SITES <br /> FUNDED BY <br /> EUGENE PARKS AND OPEN SPACE FUNDING <br /> 1. Danebo School Fields -- $150,000: Add drainage and irrigation to three fields. Estimated <br /> down time time: 8 weeks. <br /> 2. Jefferson School Fields -- $165,000: Add drainage to 4 -J irrigated field; improve two <br /> additional fields with drainage and irrigation. Estimated down time: 8 weeks. <br /> 3. Malabon School Fields -- $80,000: Add drainage and irrigation to two fields. Estimated <br /> down time: 6 weeks. <br /> 4. Spencer Butte Fields -- $40,000/80,000: Add drainage to one or two irrigated field. <br /> Estimated down time: 3 - 4 weeks. <br /> 5. Roosevelt School Fields -- $90,000: Add drainage to two irrigated fields. Estimated down <br /> time: 3 weeks. <br /> 6. Monroe School Fields -- $50,000: Add irrigation and some drainage to field inside running <br /> track. Estimated down time: 5 weeks. <br /> 7. Washington School Fields - -$1 0,000: Aerate, top dress and overseed one field. Estimated <br /> site down time: one week. <br /> 8. Willard/Eastside Fields -- $50,000: Add irrigation and drainage to one field. Estimated <br /> site down time: 6 weeks. <br /> 9. Willakenzie School Fields -- $80,000: Upgrade two fields with irrigation and some <br /> drainage. Estimated down time: 7 weeks. <br /> Down time is considered to begin when construction begins and run until field is playable. With <br /> "Sand Channel" drainage, or trenches 6" or less in width, the field can be returned to play upon <br /> completion of the work. Turf over sand trenches is not an option; seeding in the sand is an <br /> option. When seeding, it is recommended to hold the field out of play for 3 - 4 months on <br /> softball fields, and 8 - 11 months for soccer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.