EUGENE SCHOOL DISTRICT 4J - MULTI -USE ATHLETIC FIELDS STUDY <br /> PROJECT COST SUMMARY January 21, 1999 <br /> OPTION 1 - FOUR SEPARATE FIELDS <br /> CHURCHILL HIGH SCHOOL - @ TRACK <br /> BASIC FIELD COMPONENTS <br /> 1 FIELD ENGINEERING SUPPORT $9,200 <br /> 2 FIELD SURFACE AND DRAINAGE SYSTEM $1,196,785 <br /> 3 CHAIN LINK FENCE AND GATES $60,115 <br /> 4 PAVEMENT BETWEEN FENCE AND FIELD $102,308 <br /> 5 WALKWAYS BETWEEN PARKING AND FIELD $148,838 <br /> 6 EMERGENCY AND SERVICE VEHICLE ACCESS $0 <br /> 7 UTILITY AND SERVICE ROUGH -IN $200,747 <br /> 8 TRACK AND FIELD AMENITIES REPLACEMENT $31,823 <br /> 9 GOAL POSTS AND EQUIPMENT $12,206 <br /> SUBTOTAL $1,762,022 <br /> ADDITIONAL PROJECT ENHANCEMENTS <br /> 1 ELECTRONIC SCOREBOARD $27,012 <br /> 2 1000 SEAT GRANDSTAND AND OBSERVATION BOOTH $294,497 <br /> 3 ELEVATOR TO OBSERVATION BOOTH • $80,848 <br /> 4 RESTROOM FACILITIES $280,544 <br /> 5 CONCESSION FACILITY $69,094 <br /> 6 FIELD LIGHTING SYSTEM $159,892 <br /> 7 ACOUSTICAL SOUND SYSTEM $23,046 <br /> 8 FENCED AREA FOR DUMPSTER $6,358 <br /> 9 ENCLOSED BICYCLE SHELTER $10,466 <br /> SUBTOTAL $951,757 <br /> TOTAL PROJECT COST AT THIS SITE $2,713,779 <br /> THESE ARE PRELIMINARY FIGURES SUBJECT TO REFINEMENT IN THE FINAL REPORT <br /> WBGS ARCHITECTURE AND PLANNING PC 1/20/99 <br /> PROJECT COST SUMMARY PAGE 2 <br />