New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
4J Stadium, Through May 1999
COE
>
PW
>
POS_PWM
>
Parks
>
Miscellaneous
>
4J Stadium, Through May 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2014 1:47:14 PM
Creation date
10/16/2014 11:23:51 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cal Young Cost Revisions <br /> I Reductions <br /> Reduce number of trees in neighborhood park from 30 to 22 $ 3,779 <br /> Reduce area of concrete path in neighborhood park $ 3,439 <br /> Separate out lighting as an add alternate $ 10,959 <br /> Incorporate west park enter node into neighborhood park $ 3,691 <br /> Incorporate north park enter node into neighborhood park $ 3,691 <br /> Remove line item for EWEB SDC $ 11,337 <br /> Total cost reductions for Cal Young $ 36,896 <br /> (Additions <br /> Modify scope of skatepark to match original budget allocation of 125,000 $ 20,973 <br /> Add asphalt paving to neighborhood park $ 7,716 <br /> Add arrival signs to neighborhood park $ 1,134 <br /> Increase length of water service to restrooms $ 1'x,386 <br /> Total cost increases for Cal Young $ 31,209 <br /> Net cost reduction for Cal Young to date $ 5,687 <br /> Recommendations for Cal Young <br /> Reductions <br /> No further reductions in scope or material allowances for park features are advised, <br /> with the following exception: <br /> Covered bike parking as add alternate $ 5,500 <br /> Some areas of potential savings that may arise from further investigation of site conditions: <br /> Reduce or eliminate imported topsoil for park areas $ 5,500 <br /> Reduce utility costs through design efficiencies ? <br /> Budget items to restore /add <br /> Increase minimum width of park paths from 5' to 6' $ 1,500 <br /> Change galvanized chain link fence to black, plastic coated chain link fence ? <br />
The URL can be used to link to this page
Your browser does not support the video tag.