New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
4J Stadium, Through May 1999
COE
>
PW
>
POS_PWM
>
Parks
>
Miscellaneous
>
4J Stadium, Through May 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2014 1:47:14 PM
Creation date
10/16/2014 11:23:51 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1G/11/99 MON 11:02 FAX 541 342 1535 WBGS ARCHITECTS 001 <br /> • <br /> Fax <br /> Project: City of Eugene / District 4J <br /> Youth Sports Parks / Athletic Fields <br /> \VB c s Date: October 11, 1999 <br /> To: Bill Hirsh 4J 687 -3686 <br /> ARCHITECTURE Teri Higgins 4J /City of Eugene 682 -8410 (COE) <br /> 6z PLANNING, PC 687 -3259 (4J) <br /> Brian McCarthy CMG 485 -7389 <br /> Matt Scheibe CMG 485 -7389 <br /> Monica Anderson BHE 345 -5303 <br /> Judy MacDonald BHE 345 -5303 <br /> Janice Shafer BHE 345 -5303 <br /> Scott Metzler SCA 311 1821 <br /> Oliver Raab Interface Engineering 503/364 -5434 <br /> Dale Stadler Interface Engineering 503/364 -5434 <br /> Tracy Hokanson Interface Engineering 503/364 -5434 <br /> Stan Pszczolkowski Arch Cost Consultants 503/297 -7187 <br /> Cc: Bill Seider WBGS <br /> Kari Greene WBGS <br /> Fax: see above <br /> From: Curtis Wilson <br /> Number of pages including this cover sheet: 7 <br /> If you do not receive all pages, please call (541) 342 - 7291 as soon as possible <br /> Subject: Schematic Design Cost Estimate — Summary of Draft <br /> PRINCIPALS: Attached is a summary comparision of the SD cost estimate and the February 5 cost estimate. <br /> RICHARD P. BRYANT, AIA I would like each of the consultants to review their information to verify we are presenting the <br /> • most correct information available, and then I like to have a list of ideas for potential cost <br /> ERIC L GUNDERSON. AIA savings reductions to share with the City and 4J. <br /> • <br /> WILLIAM D. SEIDER, AIA <br /> A few areas that I've identified to correct in the cost savings are the allowances used for the <br /> ASSOCIATE: skateparks and the Childrens' Play Areas. <br /> CURTIS WILSON, AIA I will be e- mailing more specific questions to each of the consultants today. <br /> HARRIET R. CHERRY, AIA <br /> Contact me if you have any questions. <br /> 72 WEST BROADWAY Thanks, <br /> EUGENE, OREGON 97401 Curt <br /> PHONE 541- 342 -7291 <br /> FAX 541. 342 -1535 Filename: 4.J FIELDS DESIGN TEAM.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.