• <br /> EUGENE SCHOOL DISTRICT 4J - MULTI -USE ATHLETIC FIELDS STUDY <br /> PROJECT COST SUMMARY FEBRUARY 4, 1999 <br /> SUMMARY OF COSTS FOR EACH OPTION INCLUDED IN THE STUDY <br /> OPTION 1 - SEPARATE FIELDS AT EACH HIGH SCHOOL <br /> A B C D E F <br /> BASIC BASIC FIELD ADD ADD ADD ALL <br /> FIELD & UTILITY BLEACHERS ADDITIONAL RESTROOMS & FEATURES <br /> COSTS SERVICES & LIGHTS COMPONENTS CONCESSIONS INCLUDED <br /> CHURCHILL HIGH SCHOOL $1,178,017 $1,276,813 $1,603,976 $1,652,254 $2,099,410 $2,206,346 <br /> NORTH EUGENE HIGH SCHOOL $1,190,723 $1,268,418 $1,595,581 $1,643,859 $2,078,633 $2,141,900 <br /> SHELDON HIGH SCHOOL $1,168,143 $1,227,089 $1,549,327 $1,597,605 $1,987,466 $2,101,963 <br /> SOUTH EUGENE HIGH SCHOOL $1,121,010 $1,157,581 $1,479,819 $1,528,097 $1,899,673 $1,968,958 <br /> TOTAL COSTS FOR ALL FOUR HIGH SCHOOLS $4,657,893 $4,929,901 $6,228,703 $6,421,815 $8,065,182 $8,419,167 <br /> OPTION 2 - SINGLE FIELD <br /> LOCATED AT THE KENNEDY MIDDLE SCHOOUCHURCHILL HIGH SCHOOL CAMPUS <br /> A B C D E F <br /> BASIC BASIC FIELD ADD ADD ADD ALL <br /> FIELD & UTILITY BLEACHERS ADDITIONAL RESTROOMS & FEATURES <br /> COSTS SERVICES & LIGHTS COMPONENTS CONCESSIONS INCLUDED <br /> IF BUILT INSIDE EXISTING TRACK $1,299,677 $1,397,547 $2,123,025 $2,171,303 $2,680,272 $3,198,160 <br /> IF BUILT ON FIELDS SOUTH OF TRACK $1,242,276 $1,310,944 $2,031,497 $2,079,775 $2,625,894 $3,115,929 <br /> BASIC FIELD COSTS INCLUDE: <br /> 1 FIELD ENGINEERING <br /> 2 FIELD SURFACE AND DRAINAGE <br /> 3 CHAIN LINK FENCE AND GATES <br /> 4 PAVEMENT BETWEEN FENCE AND FIELD <br /> 5 WALKWAY BETWEEN PARKING AND FIELD <br /> 6 EMERGENCY AND SERVICE VEHICLE ACCESS <br /> 7 TRACK AND FIELD AMENITIES REPLACEMENT <br /> 8 GOAL POSTS <br /> BASIC FIELD & UTILITY COSTS INCLUDE: <br /> ALL OF THE ABOVE ITEMS 1 - 8 PLUS <br /> 9 ADD FIRE WATER UTILITY SERVICE <br /> 10 ADD ELECTRICAL UTILITY SERVICE <br /> ADDITION OF BLEACHERS AND LIGHTS INCLUDE: <br /> ALL OF THE ABOVE ITEMS 1 -10 PLUS <br /> 11 ADD 1000 SEAT GRANDSTAND <br /> 12 ADD ELEVATOR TO OBSERVATION BOOTH <br /> 13 ADD FIELD LIGHTING <br /> ADDITIONAL COMPONENTS INCLUDE <br /> ALL OF THE ABOVE ITEMS 1 -13 PLUS <br /> 14 ADD SCORE BOARD <br /> 15 ADD ACOUSTICAL SOUND SYSTEM <br /> 16 ADD DUMPSTER STORAGE AREA <br /> ADDITION OF RESTROOMS AND CONCESSIONS INCLUDE: <br /> ALL OF THE ABOVE ITEMS 1 -16 PLUS <br /> 17 ADD RESTROOM FACILITIES <br /> 18 ADD CONCESSION BUILDING <br /> 19 ADD SANITARY SEWER UTILITY SERVICE <br /> 20 ADD DOMESTIC WATER UTILITY SERVICE <br /> • <br /> ALL OF THE PROPOSED FEATURES INCLUDE: <br /> ALL OF THE ABOVE ITEMS 1 -20 PLUS <br /> 21 ADD WALKWAY LIGHTING BETWEEN PARKING AND FIELD <br /> WBGS ARCHITECTURE PLANNING PC 2/4/99 <br /> PROJECT COST SUMMARY PAGE 1 <br />