New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Sections of Delta Highway Closed Three Nights for Bridge Work
COE
>
PW
>
Admin
>
Public Affairs
>
2014
>
Sections of Delta Highway Closed Three Nights for Bridge Work
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2014 9:39:23 AM
Creation date
9/25/2014 9:39:23 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
Engineering
PW_Subject_Public_Affairs
Road Repairs
External_View
No
PWA_Release_Date
9/25/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br />September 25, 2014 <br /> <br />CONTACT: Scott Gillespie, Project Manager, 541-682-2706 <br /> <br />From Public Information Section, 541-682-5523 or 541-954-2938 <br /> <br />FOR IMMEDIATE RELEASE <br /> <br /> <br />Sections of Delta Highway Closed Three Nights for Bridge Work <br />Construction of a new bridge over Delta Highway at Goodpasture Island Road will require lane <br /> <br />closures on Delta Highway the nights of Tuesday, Sept. 30, through Thursday, Oct. 2. <br />The northbound lanes of Delta Highway from the Goodpasture Island Road off-ramp to the <br />Goodpasture Island on-ramp will be closed for one night, Sept, 30, from 7 p.m. to 6 a.m., to place precast <br />concrete slabs over the northbound lanes. Northbound Delta Highway will remain open but drivers will be <br />required to use the off- and –on ramps at Goodpasture Island to portage around the construction zone. <br />The southbound lanes of Delta Highway from Randy Pape’ Beltline Highway to the Goodpasture <br />Island Road off-ramp will be closed for two consecutive nights, Oct. 1 and Oct. 2, from 7 p.m. to 6 a.m., to place <br />precast concrete slabs over the southbound lanes. The Goodpasture Island Road southbound on-ramp will <br />remain open for vehicles turning from Goodpasture Island Road to southbound Delta Highway. The off-ramp <br />from eastbound Beltline to southbound Delta will be closed at Beltline, and traffic exiting westbound Beltline <br />at Delta will be required to turn right. <br />During all three nights, Goodpasture Island Road will be reduced to one lane with traffic control, and <br />lane restrictions and flagging will be in effect. Motorists should expect delays. Use alternate routes and <br />surface streets if possible. <br />The new bridge has been under construction for several months and is expected to be completed in <br />late November. No additional closures of Delta Highway are scheduled at this time; however, motorists <br />should observe the 45 MPH speed limit and watch for signs, workers, equipment and lane detours in the <br />construction zone. <br /> For more information on this and other area road projects, go to . <br />www.keepusmoving.info <br /># # # <br /> <br />Public Works Administration ● City of Eugene ● 101 E. Broadway, Suite 400, Eugene, OR 97401 <br />Phone 541-682-8421 ● Fax 541-682-6826 ● www.eugene-or.gov/pw <br />
The URL can be used to link to this page
Your browser does not support the video tag.