|
I bl�trackor 2G CONSTRUCTION City of Eugene u,_�y� „q.��a•
<br />b; #_ 93004555 Contract Pay Sheets Current Amount { $1,083,040.59
<br />ontract 201400003 Payment No : 011 Contrackgwarcf ©ate 07!24113
<br />2 014100050 Run Date: 0711712014 ompetion Oate 01131!14
<br />sessable `' NO Page: 1
<br />WASHINGTONMEFFERSON SKATE. PARK LOCATED AT 240 WASHINGTON STREET
<br />= 7
<br />Cuirreni;
<br />Cantraat
<br />Es,tamatec[
<br />Prrien
<br />Cumulative,
<br />xo4rals °E
<br />LlnN0 N0.
<br />_ Descripli0n
<br />C.O.
<br />Unl�l Price
<br />Measure
<br />4vanuty
<br />- Amount
<br />QuanlAy
<br />Amount
<br />Quanlily
<br />- Amount
<br />POS SKATE PARK CITY CENTER
<br />Base Sid
<br />($000.00)
<br />DAY
<br />01000
<br />$0.00
<br />26.000
<br />($20,800.00)
<br />26.000
<br />($20,800.00)
<br />0000
<br />Liquidated Damages
<br />$82,092,37
<br />LUMPSUM
<br />1.000
<br />$82,092.37
<br />0.000
<br />$0.00
<br />1.000
<br />$82,092.37
<br />003-0
<br />0020
<br />MOBILIZATION
<br />TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE
<br />$2,759,00
<br />LUMPSUM
<br />1.000
<br />$2,759.00
<br />0.000
<br />$0.00
<br />$0.00
<br />1.000
<br />1.000
<br />$2,759.00
<br />$SG.00
<br />0030
<br />CW[4 PLAN
<br />$56,00
<br />EACH
<br />1.000
<br />$56.00
<br />$56.00
<br />0.000-
<br />1.000
<br />- $56.00
<br />1.000
<br />$56.00
<br />0040
<br />CV*l SUMMARY
<br />$56.00
<br />EACH
<br />1,000
<br />5.000
<br />$325.00
<br />0.000
<br />$0.00
<br />5.000
<br />$325.00
<br />0050
<br />EROSION - INLET PROTECTION
<br />$65.00
<br />$843.00
<br />EACH
<br />EACH
<br />2.000
<br />$3.,686,00
<br />0.000
<br />$0.00
<br />1.000
<br />$843.00
<br />0060
<br />EROSION - CONSTRUCTION ENTRANCE
<br />$160.00
<br />EACH
<br />1.000
<br />$160.00
<br />0.000
<br />$0.00
<br />1.000
<br />$160.00
<br />0070
<br />EROSION - CONCRETE WASHOUT
<br />$55.98
<br />EACH
<br />10.000
<br />$559.80
<br />0.000
<br />$0.00
<br />7.000
<br />$391.86
<br />DO80
<br />EROSION - .CONCRETE ?]ASHOUT MAINT.
<br />$2.58
<br />FOOT
<br />425.000
<br />$1,096.50
<br />0.000
<br />$0.00
<br />425.000
<br />$1,096.50
<br />0090
<br />EROSION - COMPOST FILTER SOCK
<br />$4.47
<br />FOOT
<br />1,140.000
<br />$5,095.80
<br />56.800
<br />$253.90
<br />1,137.000
<br />$5,082.39
<br />0100
<br />CHAIN LINK FENCING - SITE PROTECTION
<br />$1,79
<br />FOOT
<br />1,720.0,00
<br />$3,078.80
<br />0.000
<br />$0.00
<br />1,564.500
<br />$2,800.46
<br />0110
<br />TREE PROTECTION FENCING
<br />$0.00
<br />GAL
<br />190,000.000
<br />$0.00
<br />01000
<br />$0.00
<br />97,212.000
<br />$0.00
<br />0120
<br />TREE VIATERING
<br />$43.68
<br />CUYD
<br />55.000
<br />$2,402.40.
<br />0.000
<br />$0.00
<br />0.000
<br />$0.00
<br />0130
<br />0140
<br />TREE ROOT ZONE MULCH
<br />UTILITY & IRR - CUTTING/ CAPPING/ DEMO
<br />$1,459.00
<br />LUMPSUM
<br />1.000
<br />$1,459.00
<br />0.000
<br />$0.00
<br />11000
<br />41.000
<br />$1,459.00
<br />$3,308.29
<br />0150
<br />TREE REMOVAL
<br />$80.69
<br />EACH
<br />43,000
<br />$3,469.67
<br />0.000
<br />0,000
<br />$0.00
<br />$0.00
<br />1.000
<br />$25,107.00
<br />0160
<br />REMOVAL OF STRUCTURES AND OBSTRUCTIONS
<br />$25,107.00
<br />LUMPSUM
<br />1,000
<br />$2.5,107.00
<br />$4,206.00
<br />0.000
<br />$0.00
<br />11000
<br />$4,206.00
<br />0170
<br />CLEARING & GRUBBING
<br />$4,206.00
<br />LUMPSUM
<br />1.000
<br />1.000
<br />$24,940,00
<br />0.000
<br />$0.00
<br />1.000
<br />$
<br />03.80 -.
<br />TEMPORARY ELECTRICAL CONNECTIONS
<br />$24,940.00
<br />LUMPSUM
<br />$6,959.00
<br />01000
<br />$0.00
<br />7.000
<br />$6,959.00
<br />01.90'
<br />GENERAL EXCAVATION
<br />$6,959.00
<br />LUMPSUM
<br />1.000
<br />205.000
<br />$5,2.19.30
<br />0.000
<br />$0.00
<br />211.800
<br />$5,392.43
<br />0200
<br />8 INCH SW C900 PIPE
<br />$25.46
<br />$741,00
<br />FOOT
<br />EACH
<br />2.000
<br />$1,482.00
<br />0.000
<br />$0.00
<br />2.000
<br />$1,482.00
<br />0210'
<br />MINOR ADJUST STORMJgATER VAULT & LID
<br />$772,00
<br />EACH
<br />2.000
<br />$1,544.00
<br />0.000
<br />$0.00
<br />2.000
<br />$1,544.00
<br />0220
<br />MAJOR ADJUST STORMWATER VAUVP & LID
<br />$35.00
<br />FOOT
<br />91000
<br />$315.00
<br />0.000
<br />$0.00
<br />57.400
<br />$2,009.00
<br />0230
<br />4 INCH SVI 3034 PIPE
<br />$16.98
<br />FOOT
<br />6351000
<br />$10,782.30
<br />0.000
<br />$0.00
<br />714.200
<br />$12,127.12
<br />0240
<br />6 INCH SVI 3034 PIPE
<br />$24.31
<br />FOOT
<br />61.000
<br />$1,482.91
<br />0.000
<br />- $0.00
<br />61.200
<br />$1,487.77
<br />0250
<br />8 INCH Sjq 3034 PIPE
<br />$57.24
<br />FOOT
<br />40.000
<br />$2,289.$0
<br />0,000
<br />$0.00
<br />40,000
<br />$2,2
<br />0260
<br />12 INCH SW 3034 PIPE
<br />$14.02
<br />FOOT
<br />190.000
<br />$2,815.80
<br />0.000
<br />$0.00
<br />195.000
<br />$2,889.90
<br />0270
<br />4 INCH SW DRAIN PIPE (FRENCH DRAIN)
<br />$765.00
<br />EACH
<br />4.000
<br />$3,060.00
<br />0.000
<br />$0.00
<br />4.000
<br />$3,060.00
<br />0280
<br />CATCH BASIN, PARK
<br />$24.00
<br />EACH
<br />6.000
<br />$144.00
<br />01000
<br />$0.00
<br />6.000
<br />$144,00
<br />0290
<br />PARK AREA DRAIN
<br />$900.00
<br />EACH
<br />1.000
<br />$900.00
<br />0.000
<br />$0.00
<br />1.000
<br />$900.00
<br />0300
<br />PARK TRENCH DRAIN
<br />$188.00
<br />EACH
<br />2.000
<br />$376.00
<br />0.000
<br />$0.00
<br />2.000
<br />$376.00
<br />0310
<br />6. INCH SW CLEANOUT
<br />$180.00
<br />EACH
<br />2.000
<br />$360.00
<br />0.000
<br />$0,00
<br />3.000
<br />$540.00
<br />0320
<br />CONNECTION, STORMWATER
<br />$17.76
<br />FOOT
<br />98.000
<br />$1,740.48
<br />0.000
<br />$0.00
<br />93.500
<br />$1,660.56
<br />0330
<br />4 INCH 4IW SCH. 40 PIPE
<br />i4
<br />i9
<br />
|