I bl�trackor 2G CONSTRUCTION City of Eugene u,_�y� „q.��a• <br />b; #_ 93004555 Contract Pay Sheets Current Amount { $1,083,040.59 <br />ontract 201400003 Payment No : 011 Contrackgwarcf ©ate 07!24113 <br />2 014100050 Run Date: 0711712014 ompetion Oate 01131!14 <br />sessable `' NO Page: 1 <br />WASHINGTONMEFFERSON SKATE. PARK LOCATED AT 240 WASHINGTON STREET <br />= 7 <br />Cuirreni; <br />Cantraat <br />Es,tamatec[ <br />Prrien <br />Cumulative, <br />xo4rals °E <br />LlnN0 N0. <br />_ Descripli0n <br />C.O. <br />Unl�l Price <br />Measure <br />4vanuty <br />- Amount <br />QuanlAy <br />Amount <br />Quanlily <br />- Amount <br />POS SKATE PARK CITY CENTER <br />Base Sid <br />($000.00) <br />DAY <br />01000 <br />$0.00 <br />26.000 <br />($20,800.00) <br />26.000 <br />($20,800.00) <br />0000 <br />Liquidated Damages <br />$82,092,37 <br />LUMPSUM <br />1.000 <br />$82,092.37 <br />0.000 <br />$0.00 <br />1.000 <br />$82,092.37 <br />003-0 <br />0020 <br />MOBILIZATION <br />TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE <br />$2,759,00 <br />LUMPSUM <br />1.000 <br />$2,759.00 <br />0.000 <br />$0.00 <br />$0.00 <br />1.000 <br />1.000 <br />$2,759.00 <br />$SG.00 <br />0030 <br />CW[4 PLAN <br />$56,00 <br />EACH <br />1.000 <br />$56.00 <br />$56.00 <br />0.000- <br />1.000 <br />- $56.00 <br />1.000 <br />$56.00 <br />0040 <br />CV*l SUMMARY <br />$56.00 <br />EACH <br />1,000 <br />5.000 <br />$325.00 <br />0.000 <br />$0.00 <br />5.000 <br />$325.00 <br />0050 <br />EROSION - INLET PROTECTION <br />$65.00 <br />$843.00 <br />EACH <br />EACH <br />2.000 <br />$3.,686,00 <br />0.000 <br />$0.00 <br />1.000 <br />$843.00 <br />0060 <br />EROSION - CONSTRUCTION ENTRANCE <br />$160.00 <br />EACH <br />1.000 <br />$160.00 <br />0.000 <br />$0.00 <br />1.000 <br />$160.00 <br />0070 <br />EROSION - CONCRETE WASHOUT <br />$55.98 <br />EACH <br />10.000 <br />$559.80 <br />0.000 <br />$0.00 <br />7.000 <br />$391.86 <br />DO80 <br />EROSION - .CONCRETE ?]ASHOUT MAINT. <br />$2.58 <br />FOOT <br />425.000 <br />$1,096.50 <br />0.000 <br />$0.00 <br />425.000 <br />$1,096.50 <br />0090 <br />EROSION - COMPOST FILTER SOCK <br />$4.47 <br />FOOT <br />1,140.000 <br />$5,095.80 <br />56.800 <br />$253.90 <br />1,137.000 <br />$5,082.39 <br />0100 <br />CHAIN LINK FENCING - SITE PROTECTION <br />$1,79 <br />FOOT <br />1,720.0,00 <br />$3,078.80 <br />0.000 <br />$0.00 <br />1,564.500 <br />$2,800.46 <br />0110 <br />TREE PROTECTION FENCING <br />$0.00 <br />GAL <br />190,000.000 <br />$0.00 <br />01000 <br />$0.00 <br />97,212.000 <br />$0.00 <br />0120 <br />TREE VIATERING <br />$43.68 <br />CUYD <br />55.000 <br />$2,402.40. <br />0.000 <br />$0.00 <br />0.000 <br />$0.00 <br />0130 <br />0140 <br />TREE ROOT ZONE MULCH <br />UTILITY & IRR - CUTTING/ CAPPING/ DEMO <br />$1,459.00 <br />LUMPSUM <br />1.000 <br />$1,459.00 <br />0.000 <br />$0.00 <br />11000 <br />41.000 <br />$1,459.00 <br />$3,308.29 <br />0150 <br />TREE REMOVAL <br />$80.69 <br />EACH <br />43,000 <br />$3,469.67 <br />0.000 <br />0,000 <br />$0.00 <br />$0.00 <br />1.000 <br />$25,107.00 <br />0160 <br />REMOVAL OF STRUCTURES AND OBSTRUCTIONS <br />$25,107.00 <br />LUMPSUM <br />1,000 <br />$2.5,107.00 <br />$4,206.00 <br />0.000 <br />$0.00 <br />11000 <br />$4,206.00 <br />0170 <br />CLEARING & GRUBBING <br />$4,206.00 <br />LUMPSUM <br />1.000 <br />1.000 <br />$24,940,00 <br />0.000 <br />$0.00 <br />1.000 <br />$ <br />03.80 -. <br />TEMPORARY ELECTRICAL CONNECTIONS <br />$24,940.00 <br />LUMPSUM <br />$6,959.00 <br />01000 <br />$0.00 <br />7.000 <br />$6,959.00 <br />01.90' <br />GENERAL EXCAVATION <br />$6,959.00 <br />LUMPSUM <br />1.000 <br />205.000 <br />$5,2.19.30 <br />0.000 <br />$0.00 <br />211.800 <br />$5,392.43 <br />0200 <br />8 INCH SW C900 PIPE <br />$25.46 <br />$741,00 <br />FOOT <br />EACH <br />2.000 <br />$1,482.00 <br />0.000 <br />$0.00 <br />2.000 <br />$1,482.00 <br />0210' <br />MINOR ADJUST STORMJgATER VAULT & LID <br />$772,00 <br />EACH <br />2.000 <br />$1,544.00 <br />0.000 <br />$0.00 <br />2.000 <br />$1,544.00 <br />0220 <br />MAJOR ADJUST STORMWATER VAUVP & LID <br />$35.00 <br />FOOT <br />91000 <br />$315.00 <br />0.000 <br />$0.00 <br />57.400 <br />$2,009.00 <br />0230 <br />4 INCH SVI 3034 PIPE <br />$16.98 <br />FOOT <br />6351000 <br />$10,782.30 <br />0.000 <br />$0.00 <br />714.200 <br />$12,127.12 <br />0240 <br />6 INCH SVI 3034 PIPE <br />$24.31 <br />FOOT <br />61.000 <br />$1,482.91 <br />0.000 <br />- $0.00 <br />61.200 <br />$1,487.77 <br />0250 <br />8 INCH Sjq 3034 PIPE <br />$57.24 <br />FOOT <br />40.000 <br />$2,289.$0 <br />0,000 <br />$0.00 <br />40,000 <br />$2,2 <br />0260 <br />12 INCH SW 3034 PIPE <br />$14.02 <br />FOOT <br />190.000 <br />$2,815.80 <br />0.000 <br />$0.00 <br />195.000 <br />$2,889.90 <br />0270 <br />4 INCH SW DRAIN PIPE (FRENCH DRAIN) <br />$765.00 <br />EACH <br />4.000 <br />$3,060.00 <br />0.000 <br />$0.00 <br />4.000 <br />$3,060.00 <br />0280 <br />CATCH BASIN, PARK <br />$24.00 <br />EACH <br />6.000 <br />$144.00 <br />01000 <br />$0.00 <br />6.000 <br />$144,00 <br />0290 <br />PARK AREA DRAIN <br />$900.00 <br />EACH <br />1.000 <br />$900.00 <br />0.000 <br />$0.00 <br />1.000 <br />$900.00 <br />0300 <br />PARK TRENCH DRAIN <br />$188.00 <br />EACH <br />2.000 <br />$376.00 <br />0.000 <br />$0.00 <br />2.000 <br />$376.00 <br />0310 <br />6. INCH SW CLEANOUT <br />$180.00 <br />EACH <br />2.000 <br />$360.00 <br />0.000 <br />$0,00 <br />3.000 <br />$540.00 <br />0320 <br />CONNECTION, STORMWATER <br />$17.76 <br />FOOT <br />98.000 <br />$1,740.48 <br />0.000 <br />$0.00 <br />93.500 <br />$1,660.56 <br />0330 <br />4 INCH 4IW SCH. 40 PIPE <br />i4 <br />i9 <br />