<br /> <br /> <br /> <br /> <br />August 28, 2014 <br /> <br />CONTACT: Eric Johnson, Surface Maintenance Manager, 541-682-4904 <br /> <br />From Public Information Section, 541-682-5523 or 541-954-2938 <br /> <br />FOR IMMEDIATE RELEASE <br /> <br /> <br />Traffic Advisory <br />Watch for Lane Closures on Broadway (Franklin Boulevard) near Hilyard <br /> <br /> <br />Eugene Public Works will close two lanes on westbound Broadway (often referred to as <br />Franklin Boulevard) just east of Hilyard Street on Friday, August 29. <br />The closures of one through lane to the downtown area and Ferry Street Bridge and one right- <br />turn lane on Hilyard will be from 7:30 a.m. to 3:30 p.m. <br />The closures are necessary for Public Works Maintenance crews to repair a large pothole <br />caused by an underground void from a failed utility pipe. <br />For current information on road work in the Eugene area, follow EugenePW on Twitter. <br /># # # <br /> <br /> <br />Public Works Administration ● City of Eugene ● 101 E. Broadway, Suite 400, Eugene, OR 97401 <br />Phone 541-682-8421 ● Fax 541-682-6826 ● www.eugene-or.gov/pw <br />