and that the remaining concrete could be set <br /> before the Sonatube forms deteriorate and have to <br /> be replaced (re- excavation of hole). I <br /> reiterated that no further digging of any kind <br /> could take place. He suggested that a <br /> knowledgeable person could examine and choose a <br /> location for excavation based on confirmation <br /> that it is a location free of environmental <br /> concerns. I suggested that might be a <br /> possibility, but not until a plan is accepted <br /> that included approved remedial actions. <br /> to develop an acceptable plan for completing the <br /> project. <br />