WORK ACCOMPLISHED ON AMAZON TRAIL LIGHTING PROJECT <br /> TURN- AROUND LOOP FORMED OUT OF EXISTING 1500 METER LOOP GRAVELED <br /> AND BARKED. <br /> TRENCH ALONG ENTIRE 2 MILE AND TURN - AROUND LOOP. <br /> CONDUIT LAYED FOR ENTIRE z MILE AND TURN - AROUND LOOP,TRENCH FILLED IN. <br /> TRENCH FROM 10 FEET EAST OF AMAZON PARKWAY TO POWER CONTROL PEDESTAL. <br /> LAY 2 INCH CONDUIT FROM 10 FEET EAST OF AMAZON PARKWAY TO POWER PED. <br /> MOUNT RISERS AND SET SAUNA TUBES FOR 27 LIGHTS. <br /> WIRE HAS BEEN RUN THROUGH 9 RISERS AND 9 POLES HAVE BEEN SET IN CONCRETE. <br /> WORK TO BE ACCOMPLISHED ON AMAZON LIGHTING PROJECT IN NEAR FUTURE <br /> A. WORK REMAINING ON WEST SIDE OF AMAZON PARKWAY <br /> POWER TRANSFORMER TO BE MOUNTED ON EXISTING UTILITY POLE AT 27TH & HIGH. <br /> TRENCH ON WEST SIDE OF AMAZON PARKWAY TO UTILITY POLE. <br /> LAY 2 INCH CONDUIT FROM UTILITY POLE TO AMAZON PARKWAY. <br /> ACCOMPLISH PUSH UNDER AMAZON PARKWAY WITH 2 INCH PIPE. <br /> RUN WIRE FROM POWER TRANSFORMER,DOWN UTILITY POLE THROUGH CONDUIT AND <br /> UNDER PARKWAY. <br /> FILL IN TRENCH. <br /> B.WORK REMAINING ON EASTSIDE OF AMAZON PARKWAY <br /> TRENCH FROM EDGE OF AMAZON PARKWAY 10 FEET TO HOOKUP WITH PREVIOUSLY <br /> BURIED 2 INCH CONDUIT AND FILL BACK IN. <br /> MOUNT POWER PEDESTAL ON CONCRETE BASE AND HOOKUP WIRE. <br /> RUN WIRE THROUGH CONDUIT AND REMAINING 18 RISERS. <br /> POUR CONCRETE AND SET POLES IN SAUNA TUBES. <br /> PLACE FIXTURES AND BULBS ON 27 POLES. <br />