Amazon Closure Issues <br /> July 9, 2009 <br /> 1. Buck/Seneca Connection and Station Location <br /> 2. Oak Patch to Buck/Seneca Alignment — minimize property acquisitions <br /> 3. Oak Patch Station Location <br /> 4. Proximity of alignment to the top of bank — geotechnical /foundational study <br /> 5. Staples Alignment Design (wetland, development, waterway project objectives, station <br /> location) <br /> 6. Design of N. Bank Option — e.g., greenwall technology's applicability to floodway banks <br /> 7. Design option/s for Arthur to City View to take into the DEIS <br /> 8. Channel enhancement /mitigation <br /> 9. Public involvement strategy <br /> 9. Other <br />