New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Amazon Alignment
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Amazon Alignment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2014 1:04:11 PM
Creation date
8/21/2014 1:03:23 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Amazon Closure Issues <br /> July 9, 2009 <br /> 1. Buck/Seneca Connection and Station Location <br /> 2. Oak Patch to Buck/Seneca Alignment — minimize property acquisitions <br /> 3. Oak Patch Station Location <br /> 4. Proximity of alignment to the top of bank — geotechnical /foundational study <br /> 5. Staples Alignment Design (wetland, development, waterway project objectives, station <br /> location) <br /> 6. Design of N. Bank Option — e.g., greenwall technology's applicability to floodway banks <br /> 7. Design option/s for Arthur to City View to take into the DEIS <br /> 8. Channel enhancement /mitigation <br /> 9. Public involvement strategy <br /> 9. Other <br />
The URL can be used to link to this page
Your browser does not support the video tag.