Cuthbert Planning Committee <br /> Thursday, Feb 10, 2005 <br /> Present:, Carolyn Weiss - Parks & Open Space; Glen Svendsen, Meredith Cavender, Larry <br /> Morris - Facilities; Mark Loigman, Karm Hagedorn, Robb Hankins - Cultural Services Division; <br /> Jerry McDonnell - Cultural Services Advisory Committee (CSAC), and Roland Hoskins - <br /> Facilitator <br /> Absent: Johnny Medlin, Rob Hallett - POS, Laura Niles - CSD <br /> Issues list generated from a Cuthbert "walk- through" sT=Short -term <br /> LT =Long -term <br /> DE =Design <br /> Element <br /> C, 1. Relocate Pre's Trail to the south and expand fence out to new trail in order to ST <br /> A expand backstage parking area CP <br /> 2. Improve waterway fencing. Research "reel- type" barriers similar to the ones ST <br /> used at swimming pools. <br /> 3. Increase and improve backstage area: DE <br /> • Fill in waterway to gain space LT <br /> • Improve access by adding pervious, permanent surface <br /> Investigate environmental impact ST <br /> • Move stage forward to increase stage size and backstage area <br /> Look for existing stage designs ST <br /> • Investigate widening loading ramp *High priority ST <br /> • Improve yurt facilities; replace with permanent structures LT <br /> Consider possibilities for year -round use: summer kids' classes, youth <br /> arts, nature classes, etc <br /> 4. Evict birds in stage cover ST <br /> ck"` 5. Relocate dance area which now obstructs sight lines DE <br /> w1/4-t44 d�` • Remove some of the existing benches ST <br /> 6. Change benches and seating in front of stage DE <br /> Nrs (./. 7. Permanent secure storage LT <br /> • Eliminate need to secure entire venue LT <br /> • Change level of stage LT <br /> • Add dressing rooms LT <br /> • Install permanent stage LT <br />