New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Pre's Trail in Alton Baker Park
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Pre's Trail in Alton Baker Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2014 2:41:18 PM
Creation date
8/20/2014 2:37:51 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. . <br /> Prefontaine Work Schedule <br /> Page -3- <br /> Wed —May 17 FYI only) Or der 30 yds 3 " minus gravel -�� I IS/ �- L " <br /> ( Y) Y g <br /> Thurs — May 18 <br /> Time: 8:00 am - Noon <br /> Where: Green loop —1181 ft. section <br /> Work: Finish bark removal from trail <br /> Equip: Truck w /lift tailgate (1) + Wheelbarrows (3) <br /> Staff:: Truck driver <br /> Meet: Alton Baker shop @ 7:30am <br /> Volunteers: (3) Meet @ Autzen trailhead <br /> Sat— May 20 <br /> Time: 8:00 am — 4:00,m <br /> Where: Green Loop — 1'18 . section <br /> Work: Start laying 3 /''' inus gravel on sides of trail <br /> Equip: Tractor j'rT /G Trucks (2) + Wheelbarrows (3) <br /> Staff:: Tractor • • • rator <br /> Meet: Alton Baker shop @ 7:30am <br /> Volunteers: (3 — per shift) + (2 truck drivers) Meet @ Autzen trailhead <br /> Sun — May 21 <br /> Time: 8:00 am — 4:00 pm • <br /> Where: Green Loop — 11; . section <br /> Work: Finish lain.. 4:" inus gravel on sides of trail + groom crown <br /> Equip: Tractor ( 1 + T/G Trucks (2) + Wheelbarrows (3) <br /> Staff: Tractor 1 perator <br /> Meet: Alton Baker Shop @ 7:30am <br /> Volunteers: (3 per shift) + (2 truck drivers) Meet @ Autzen trailhead <br /> Mon — May 22 <br /> Time: 8:OOam - Noon <br /> Where: Green Loop — 1181 ft. section <br /> Work: Quick compact of %" minus gravel until rail can be rolled r <br /> Equip: Tractor da ! i`.,f�I - / /kW <br /> Staff: No <br /> Volunteers: (2) for traffic control. Meet @ Aut n trailhead <br />
The URL can be used to link to this page
Your browser does not support the video tag.