Prefontaine Trail Restoration <br /> I <br /> Work Schedule — 2006 <br /> Thurs - Apr 20 <br /> Time: 8:00 am - Noon <br /> Where: Green Loop — 1181 ft. section <br /> Work: Fix water problem areas <br /> Equip: Tractor <br /> Staff: Tractor Operator <br /> Meet: Alton Baker Shop @ 7:30 am <br /> Volunteers: (2) meet @ Autzen trailhead <br /> Sun - Apr 23 <br /> Time: 8:00 am — 4:00 pm <br /> Where: Green Loop — 1181 ft. section <br /> Work: Pick up trail expansion spoils <br /> Equip: Trucks w /lift tailgate (2) + wheelbarrows (7) /30 <br /> Staff: Truck Driver <br /> Meet: Alton Baker Shop • 8:11 am. <br /> Volunteers: (8 - per shift) + (1 truck driver) ►eet @ Autzen trailhead <br /> Mon - Apr 24 <br /> Time: 8:00 am - Noon �04 �. 0,1-7,96* <br /> Where: Green loop —1181 ft section ? U1° I / S � <br /> f / Work: Compact expanded area C 1 h,, ,,g <br /> Equip: Tractor t � � <br /> Staff: . • <br /> 0 Volunteers: 0 meet @ Alton Baker Shop &Z.: <br /> L.0 A- -.A. Prtr4r c. Co 1 i <br /> Tue - Apr 25 <br /> Time: 8:00 am - Noon <br /> Where: Green loop — 1181 ft. section <br /> Work: Touch -up expanded area — get it ready for gravel <br /> Equip: Daihatsu + Tractor <br /> Staff:: None <br /> Volunteers: (3) meet @ Alton Baker Shop c* /, <br /> / <br /> Wed - Apr 26 - (FYI only) Order 10 yds. of 1 ' /2" open gravel S er- <br /> ) Thurs - Apr 27 (Not date) <br /> Time: 8:00 am - N • on lfi <br /> Where: Green Lo p — 1181 ft. section <br /> Work: Rake -n i •m rai edges <br /> Equip: Leaf ra es (8 _ <br /> Staff:: None <br /> Volunteers: 1 �' m 'et @ Autzen trailhead <br />