Prefontaine Trail Restoration <br /> Work Schedule — 2006 j <br /> .. <br /> Thurs - Apr 20 <br /> Time: 8:00 am - Noon <br /> Where: Green Loop — 1181 ft. section <br /> Work: Fix water problem areas <br /> Equip: Tractor <br /> Staff. Tractor Operator <br /> Meet: Alton Baker Shop @ 7:30 am <br /> Volunteers: (2) meet @ Autzen trailhead <br /> Sun - Apr 23 <br /> Time: 8:00 am — 4:00 pm <br /> Where: Green Loop —1181 ft. section <br /> Work: Pick up trail expansion spoils <br /> Equip: Trucks w /lift tailgate (2) + wheelbarrows (7) <br /> Staff: Truck Driver <br /> Meet: Alton Baker Shop @ 7:30 am. <br /> Volunteers: (8 - per shift ) + (1 truck driver) meet @ Autzen trailhead <br /> Mon - Apr 24 <br /> Time: 8:00 am - Noon <br /> Where: Green loop — 1181 ft section <br /> Work: Compact expanded area <br /> Equip: Tractor <br /> Staff. Tractor Operator <br /> Meet: Alton Baker Shop @ 7:30 am <br /> Volunteers: (2) for traffic control <br /> Tue - Apr 25 <br /> Time: 8:00 am - Noon <br /> Where: Green loop — 1181 ft. section <br /> Work: Touch -up expanded area — get it ready for gravel <br /> Equip: Daihatsu + Tractor <br /> Staff: None <br /> Volunteers: (3) meet @ Alton Baker Shop <br /> Wed - Apr 26 - (FYI only) Order 10 yds. of 1 %" open gravel — for 1181 ft. section <br /> Thurs - Apr 27 <br /> Time: 8:00 am - Noon <br /> Where: Green Loop — 1181 ft. section <br /> Work: Rake bark from trail edges <br /> Equip: Leaf rakes (3) <br /> Staff: None <br /> Volunteers: (6) meet @ Autzen trailhead <br />