New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Pre's Trail in Alton Baker Park
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Pre's Trail in Alton Baker Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2014 2:41:18 PM
Creation date
8/20/2014 2:37:51 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page -2- <br /> around the country and around the globe. Pre's Trail represents Eugene as our <br /> ambassador to the world. <br /> In recent years, Pre's Trail has been better known around the world than in our own <br /> community. Neglect and lack of funds had contributed to a growing obscurity in the <br /> local area. We are changing this perception. As the trail work progresses local <br /> recognition and use has significantly increased. Our vision to see Pre's Trail widely <br /> used by our own community is being realized. Our aim is to make this a resource in <br /> which we can all take pride. <br /> That is where we are today. Community and civic involvement has greatly increased. <br /> Where we go in the future is the purpose of this plan proposal. <br /> Trail Specifications <br /> Currently the T :consists of 3 loops designated by color a • - e - - - cted by single <br /> tracks. The running surf ce specifications is to a =' i se trail. The trail bed is <br /> prepared by minor excavatio d cove e: d i landscape cloth. Then a gravel bed of <br /> various size open material Is�I id- r vide drainage. This is covered by a layer of 3 /4 <br /> minus material to closes -th bed and cappe 'th another layer of 3 /" minus to provide a <br /> low crown for rte. -off drainage. A thin ' /2" lay of qu rsand is spread to insure <br /> compaction The edges of the trail are flush with the prevent equipment <br /> dams grow o The trail -bed is then covered with a 2-3" layer of�r surface for running. <br /> • <br /> g " �. <br /> Goals and Funding <br /> Goals of the project are 1) complete a restoration and upgrade of the entire length of the <br /> trail and added amenities prior to the 2008 Olympics. (Refer to the trail map, work <br /> schedule and action items). 2) provide for maintenance of the trail into the future. 3) <br /> continue to partner with the Eugene Parks Department to complete the restoration and <br /> to maintain the trail. 4) provide for the necessary funding for trail completion and <br /> maintenance. 5) partner with the Eugene Parks Department to sponsor an annual <br /> Labor day Pre's Trail Run/Walk Event. <br /> Since it's inception in 1975, the maintenance of Pre's Trail has been primarily the <br /> responsibility of OTC. This involved many thousands of hours of volunteer manpower <br /> and tens of thousands of dollars in donations and club contributions. <br /> Recently, Eugene Parks and Open Spaces has contributed significant resources of <br /> equipment, manpower, and capital to assist OTC in the restoration. This serves to <br /> reinforce the private /public partnership. Now, Eugene Parks and Open Spaces wants to <br /> lead the restoration of the Steve Prefontaine Running Trail. <br />
The URL can be used to link to this page
Your browser does not support the video tag.