MEMORANDUM 3/4/2010 <br /> Project Phasing <br /> Sustainable Design Goals — City mandate for LEED Silver <br /> Design Goals: What appearance and character is desired? <br /> Words that characterize design appearance <br /> Similar facilities with desirable features <br /> Additional site information <br /> 1. Site base maps in digital format showing property boundaries and easements. <br /> 2. Air photos or other available site mapping, legal description, or other items as available. <br /> 3. Program of building and site needs suitable for feasibility study (to be developed by PIVOT after <br /> meeting). <br /> 4. Possible project phases, i.e. pool and wet locker room built later. <br /> 5. Estimated cost of SDC charges, if needed for cost estimate <br /> 6. Cost or evaluation of land value, if needed for cost estimate. <br /> 7. Land surveys including legal and topographic information if available. <br /> 8. Geotechnical information if available <br /> Page 2 of 2 <br />