• <br /> CITY OF EUGENE QUOTATION -- FRIENDLY PARK STORM SEWER Page 2 of 3 <br /> B. The undersigned hereby proposes to furnish all materials, tools, equipment and labor for <br /> the installation of a storm sewer and area drain at Friendly Park, 27th and Monroe Street, <br /> according to a drawing with specifications entitled "Friendly Park Alley Storm Sewer" <br /> and dated August 21, 1996, for the following prices: <br /> 1. Mobilization L.S. $ 3-- <br /> 2. 42" storm manhole over existing sewer one only L.S. $ 426tO,00 <br /> 3. 10" solid PVC pipe with Class B backfill 40 L.F. @ $ 48. /S per L.F. $ t 2 00 <br /> 4. 10" perf. PVC pipe with filter fabric and <br /> Class A backfill 160 L.F. @ $ 30 per L.F. $ 4, gaD� Oo <br /> 5. 10" pipe cap or plug one only L.S. $ L cc esso <br /> 6. 24" storm manhole one only L.S. $ 750 too <br /> 7. 6" solid PVC pipe -- approx. 4 ft. between MH and area drain L.S. $ I5'e of <br /> 8. Steel area drain one only L.S. $ 3 5bt 00 <br /> 9. A.C. and P.C.C. repairs to street, curb and sidewalk L.S. $ i /Soto• <br /> 10. Clean up, finish grading and seeding L.S. $ coo, on <br /> Total Quotation $ /4 /46.6o <br /> C. In signing this proposal the undersigned contractor agrees to be bound by the following: <br /> 1. Information in the Invitation for Quotations <br /> 2. Instructions to Bidders, General Conditions, and applicable technical specifications <br /> within the City of Eugene specifications cited on the Drawing <br /> 3. Contract agreement <br /> 4. Plans and specifications on Drawing <br /> 5. Addenda, if any, numbered / through — <br /> 6. Applicable laws and codes <br /> 7. ORS 279.348 through 279.365 (relating to the prevailing rate of wage for projects in <br /> excess of $25,000) <br /> 8. Eugene Code 2.030 (relating to labor conditions, human rights and fair employment) <br /> 9. Construction time limits. <br />