BALLFIELD LIGHTING <br /> 8/3/93 <br /> Kincaid pole removal $12,000 <br /> Ascot <br /> Equipment 68,000 <br /> Installation 34,000 to 45,000 <br /> Contingency 10,000 <br /> 112,000 to 123,000 <br /> Graham <br /> Equipment 92,000 <br /> Installation 27,000 to 39,000 <br /> Pole removal 15,000 <br /> Contingency 13,000 <br /> 147,000 to 159,000 <br /> Administration /Inspection: 8% to 10% one field, 5% to 7% both fields <br />