New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Open Space Acquisition Study
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Open Space Acquisition Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2014 11:08:45 AM
Creation date
8/7/2014 11:08:21 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE <br /> PARKS, RECREATION FACILITIES AND OPEN SPACE NEEDS <br /> MARCH 1998 <br /> PLANNING DISTRICT: SOUTHEAST <br /> DESCRIPTION * Denotes Potential for SD or POS Serial Levy Funding COST <br /> Kinney Park -- develop as neighborhood park and trail head to Ridgeline Park $360,000* <br /> Shadowwood Park -- develop $50,000* <br /> Oak Hills -- acquire neighborhood park site. (Only site left is just outside UGB) $135,000* <br /> Amazon Park -- develop trail, primarily for mountain bikes, along E or W Amazon <br /> Drive, leading to the South Hills Ridgeline Trail. (Needs to wait and be <br /> coordinated with the "Jeff Krueger" plan for the Upper Amazon.) $60,000 <br /> Amazon Park -- develop a small playground at 30th and Ferry Street $50,000 <br /> Kincaid Park -- Replace backstops, add bleacher seating to ballfields $50,000 <br /> $ <br /> Milton Park -- add sidewalks and accessibility to the park. $25,000* <br /> Spencer Butte School -- Upgrade 6 sports fields $240,000* <br /> Ridgeline Acquisition -- Areas 13/19 $5,480,000 <br /> Area 9 $770,000 <br /> Southeast Subtotal $7,220,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.