New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Open Space Acquisition Study
COE
>
PW
>
POS_PWM
>
Parks
>
Specific Parks
>
Open Space Acquisition Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2014 11:08:45 AM
Creation date
8/7/2014 11:08:21 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF EUGENE <br /> PARKS, RECREATION FACILITIES AND OPEN SPACE NEEDS <br /> MARCH 1998 <br /> PLANNING DISTRICT: UNIVERSITY <br /> DESCRIPTION * Denotes Potential for SD or POS Serial Levy Funding COST <br /> Amazon Park -- Develop lighted sports (2) fields with parking $700,000( *) <br /> Restrooms for south end of park $150,000 <br /> 4 new tennis courts $150,000 <br /> Acquire land between Hilyard Center and Roosevelt School $900,000 <br /> Two foot bridges over channel $200,000 <br /> Realign jogging trail to east side of creek and remove abandoned portion $40,000 <br /> Add lights to path on east side of creek $60,000 <br /> Paved paths $25,000 <br /> Signalized intersection at 26th and Hilyard $140,000 <br /> Amazon Pool -- major remodel and upgrade, covered, with added parking $7,000,000* <br /> Laurel Hill Park -- complete development of park fronting Moon Mountain Dr, $20,000 <br /> Add path lighting between Augusta Street and Moon Mountain Drive. $10,000 <br /> Hendricks Park -- develop small playground $30,000 <br /> improve surface drainage $50,000 <br /> realign paths in Rhododendron Garden to improve maintenance <br /> access, general pedestrian circulation, and plant display $50,000 <br /> complete irrigation renovations $25,000 <br /> improve natural area paths and signage $50,000 <br /> Judkins Point -- Purchase Judkins Point scenic easement from ODOT $120,000 <br /> Ridgeline Acquisition -- Area 4 $1,045,000 <br /> Area 8 $280.000 <br /> University Subtotal $10,995,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.