UNSIGNALIZED INTERSECTION SIMULATION <br /> Location: East Access / Willakenzie Road <br /> 7 Project: Sheldon High School <br /> Date and Time: 6 -3 -98 <br /> Alternative: Existing Traffic Volumes <br /> Free Flow 20% Speed 15 mph Grade 0% <br /> [feet] Storage <br /> Volume 70 1 103 Free Flow 40% <br /> Lanes 1 Speed 35 mph <br /> 90 %tile QUEUE 6 Grade 0% <br /> LOS E D E <br /> [seciveh] DELAY 34.4 29.3 40.3 <br /> DELAY LOS 90 %tile Lanes Volume Storage <br /> East Access S (sedveh] QUEUE [feet] <br /> STOP 0.0 A 61 <br /> 6 0.0 A 0 2 312 <br /> r <br /> Willakenzie Road .� 3.6 A 0 1 135 <br /> 13 ' 1 1 A 3.4 <br /> 278 2 0 A 0.0 <br /> i 31 A t0.0 STOP <br /> 6s Storage Volume Lanes 90 %tile LOS DELAY Shopping Center <br /> [feet] QUEUE [sedveh] <br /> 16.7 13.6 8.6 DELAY (sedveh] <br /> C C B LOS <br /> '„k Free Flow 40% 0 90 %tiIeQUEUE <br /> Speed 35 mph 1 Lanes <br /> Grade 0% 21 2 99 Volume <br /> Storage [feet] <br /> P I Free Flow 50% Speed 15 mph Grade 0% <br /> II Analysis Period: 60 Minutes Number of Runs: 10 Total Simulation Time: 10.0 Hours <br /> fi <br /> WARNINGS: <br /> Bay Overflowed Bay Blocked <br /> ; <br /> Quantity Duration Percentage Quantity Duration Percentage <br /> 11 <br /> I' <br /> i <br /> 3 C : \INTERSIM \SHELEAST.USI InterSim to rS I m TM (V 2.0 ` <br /> i �/ L J <br />