New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
4J Stadium. June - September 1999
COE
>
PW
>
POS_PWM
>
Parks
>
General Parks Info
>
4J Stadium. June - September 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2014 2:55:05 PM
Creation date
8/6/2014 2:51:56 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Transportation - Unfunded Program <br /> Priority Sidewalk Installation Projects Install new sidewalks based on the sidewalk priority rating system in the adopted City <br /> of Eugene Sidewalk Program. This figure represents the unfunded need for the six -year <br /> CIP period. <br /> Plan/Policy Document: TransPlan Policy, TRIP, City Sidewalk Program <br /> Total Project Cost: $2,700,000 <br /> Railroad Crossing Upgrade Program Replace deteriorated railroad crossings with high quality new materials to improve the <br /> road surface. <br /> Plan/Policy Document: TransPlan <br /> Total Project Cost: $300,000 <br /> • <br /> Stewart Rd (Bailey Hill to Bertelsen) Upgrade to 2 lane urban facility. • <br /> Plan/Policy Document: TransPlan <br /> Total Project Cost: $550,000 <br /> Van Duyn, Harlow to Western Upgrade to a 2 lane urban facility <br /> Plan/Policy Document: TransPlan, Willakenzie Area Plan <br /> Total Project Cost: $375,000 <br /> Willow Creek Road (18th - S. City Limit) Upgrade to a 2 to 3 lane urban facility. <br /> Plan/Policy Document: TransPlan, West Eugene Wetland Plan <br /> Total Project Cost: $1,590,000 <br /> New Capital Facilities <br /> Jessen Street Path Construct a two mile path along the Jessen Street alignment (A2 channel alignment) <br /> from Ohio Street to the Beltline path. Path will be 12 feet wide, concrete, and lighted. <br /> Plan/Policy Document: Bikeways Master Plan <br /> Total Project Cost: $1,172,000 <br /> City of Eugene • 2000 -2005 Capital Improvement Program <br /> Project and Program Areas - Transportation <br /> 122 <br />
The URL can be used to link to this page
Your browser does not support the video tag.