Transportation - Unfunded Program <br /> Priority Sidewalk Installation Projects Install new sidewalks based on the sidewalk priority rating system in the adopted City <br /> of Eugene Sidewalk Program. This figure represents the unfunded need for the six -year <br /> CIP period. <br /> Plan/Policy Document: TransPlan Policy, TRIP, City Sidewalk Program <br /> Total Project Cost: $2,700,000 <br /> Railroad Crossing Upgrade Program Replace deteriorated railroad crossings with high quality new materials to improve the <br /> road surface. <br /> Plan/Policy Document: TransPlan <br /> Total Project Cost: $300,000 <br /> • <br /> Stewart Rd (Bailey Hill to Bertelsen) Upgrade to 2 lane urban facility. • <br /> Plan/Policy Document: TransPlan <br /> Total Project Cost: $550,000 <br /> Van Duyn, Harlow to Western Upgrade to a 2 lane urban facility <br /> Plan/Policy Document: TransPlan, Willakenzie Area Plan <br /> Total Project Cost: $375,000 <br /> Willow Creek Road (18th - S. City Limit) Upgrade to a 2 to 3 lane urban facility. <br /> Plan/Policy Document: TransPlan, West Eugene Wetland Plan <br /> Total Project Cost: $1,590,000 <br /> New Capital Facilities <br /> Jessen Street Path Construct a two mile path along the Jessen Street alignment (A2 channel alignment) <br /> from Ohio Street to the Beltline path. Path will be 12 feet wide, concrete, and lighted. <br /> Plan/Policy Document: Bikeways Master Plan <br /> Total Project Cost: $1,172,000 <br /> City of Eugene • 2000 -2005 Capital Improvement Program <br /> Project and Program Areas - Transportation <br /> 122 <br />