. UNSIGNALIZED INTERSECTION SIMULATION <br /> Location: West Access / Willakenzie Road <br /> Project: Sheldon High School <br /> Date and Time: 6 -03 -98 <br /> Alternative: Existing Traffic Volumes <br /> Li,\I Free Flow 50% Speed 15 mph Grade 0% <br /> [feet] Storage <br /> Volume 103 1 117 Free Flow 50% <br /> T Lanes 1 Speed 35 mph <br /> I, 90 %tile QUEUE 0 Grade 0% <br /> LOS A A A <br /> [sec/veh] DELAY 3.6 2.9 4.2 <br /> DELAY LOS 90 %tile Lanes Volume Storage <br /> West Access S [sec/veh] QUEUE [feet] <br /> STOP 3.1 A 57 <br /> T ei 4.4 A 1 2 313 <br /> Willakenzie Road S o 3.7 A 1 1 27 <br /> 89 • 1 1 B 5.2 A T P <br /> 195 2 1 A 1.9 tp P <br /> 89 A '1.4 STOP _ <br /> Storage Volume Lanes 90 %tile LOS DELAY Shopping Center <br /> [feet] QUEUE [sec/veh] <br /> 3.0 3.5 3.4 DELAY [secNeh] <br /> A A A LOS <br /> Free Flow 50% 1 90 %tile QUEUE <br /> Speed 35 mph 1 Lanes <br /> Grade 0% 41 4 6 Volume <br /> Storage [feet] <br /> Free Flow 50% Speed 15 mph Grade 0% <br /> Analysis Period: 60 Minutes Number of Runs: 10 Total Simulation Time: 10.0 Hours <br /> WARNINGS: <br /> Bay Overflowed Bay Blocked <br /> Quantity Duration Percentage Quantity Duration Percentage <br /> • C: \INTERSIM \SHELWES.USI I n to rS I m TM (V 2.0) <br />