New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
4J Stadium. June - September 1999
COE
>
PW
>
POS_PWM
>
Parks
>
General Parks Info
>
4J Stadium. June - September 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2014 2:55:05 PM
Creation date
8/6/2014 2:51:56 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> Transportation - Six -Year Funded Program <br /> Street & Alley Preservation Preserve existing improved streets and alleys City-wide, through overlays and minor <br /> reconstruction projects for roadways deteriorated to a point where operating resources <br /> for preventative maintenance are not cost -effective. <br /> Plan/Policy Document: TransPlan Policy, Pavement Management Program <br /> Total Project Cost: $2,720,000 <br /> Traffic Signal System Preservation Preserve existing traffic signal systems including detection, signal controllers and other <br /> hardware. <br /> Plan/Policy Document: TransPlan Policy <br /> Total Project Cost: $240,000 <br /> Upgrades and Capacity Enhancement <br /> Amtrak Station Improvements Acquire and improve Amtrak Station using $2.0 million federal TEA -21 funds and $0.5 <br /> million Amtrak funds. <br /> Plan/Policy Document: TransPlan <br /> Total Project Cost: $2,500,000 <br /> Bertelsen Road (18th - Bailey Hill) Upgrade to a 2 to 3 lane urban facility. <br /> Plan/Policy Document: TransPlan <br /> Total Project Cost: $1,035,000 <br /> Dillard Road (43rd - Garnet) Upgrade to a 2 to 3 lane urban facility. <br /> Plan/Policy Document: TransPlan <br /> Total Project Cost: $450,000 <br /> Fox Hollow Rd (Mahalo-S. City Limit) Upgrade to a 2 lane urban facility, including bike lanes and sidewalks on one side, <br /> consistent with existing section. <br /> Plan/Policy Document: TransPlan, CIP <br /> Total Project Cost: $841,000 <br /> Goodpasture Island Road (Delta - Happy) Improve roadway and shoulders for bicyclists and pedestrians. Project scope and cost <br /> to be adjusted depending on project feasibility and phasing plan. <br /> Plan/Policy Document: TransPlan <br /> Total Project Cost: $413,000 <br /> City of Eugene • 2000 -2005 Capital Improvement Program <br /> Project and Program Areas - Transportation <br /> 116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.