New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
4J Stadium. June - September 1999
COE
>
PW
>
POS_PWM
>
Parks
>
General Parks Info
>
4J Stadium. June - September 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2014 2:55:05 PM
Creation date
8/6/2014 2:51:56 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Building and Park Facilities - Unfunded Program <br /> Maintenance Equipment Storage Building Construct 11,000 square foot open structure to protect stored maintenance vehicles <br /> and equipment from inclement weather. <br /> Plan /Policy Document: PWM Roosevelt Facility Master Plan <br /> Total Project Cost: $400,000 <br /> New Northwest Fire Station Construct fire station to extend coverage in NW area of city. <br /> Plan /Policy Document: LCOG 1998 Fire Station Location Study <br /> Total Project Cost: $3,100,000 <br /> New Police Department Building New building to house entire Police Department including secure parking for police <br /> vehicles. Refer to master space planning document prepared by consultant. <br /> Plan /Policy Document: Police Master Space Study. <br /> Total Project Cost: $2,600,000 <br /> New West Eugene Fire Station Construct Fire Station to extend coverage in West Eugene. <br /> Plan/Policy Document: LCOG 1998 Fire Station Location Study. <br /> Total Project Cost: $3,100,000 <br /> Parking Structure Construction Construct a new facility to support parking demand from redevelopment of the west <br /> end of the downtown mall and/or development of the Broadway and Charnelton site. <br /> Plan /Policy Document: CATS <br /> \ Total Project Cost: $5,000,000 <br /> Public Safety Station Location and aquisition of a building to house a public safety station and adjacent <br /> parking lot. Lease land, complete necessary site improvement and construction. <br /> Plan/Policy Document: Public Safety Long Range Plan <br /> Total Project Cost: $275,000 <br /> River House Replacement Replace River House outdoor facility due to age as well as structural and code <br /> problems, either on existing site or on another location. New facility will include <br /> program, office and parking space. <br /> Plan/Policy Document: Facilities Condition Report <br /> Total Project Cost: $550,000 <br /> Southeast Maintenance Facility Purchase land and former 4J bus facility (located at Amazon Parkway and 20th <br /> Avenue) for storage of materials and equipment to increase the efficiency of <br /> maintenance activities in southeast Eugene, particularly during snow storms. <br /> Plan/Policy Document: <br /> Total Project Cost: 5225,000 <br /> Storage Facility Construct storage facility of approximately 10,000 square feet. <br /> Plan /Policy Document: <br /> Total Project Cost: $350,000 <br /> City of Eugene • 2000 -2005 Capital Improvement Program <br /> Project and Program Areas - Building and Park Facilities <br /> 109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.