• Dillard Connector: Construct a trail through the City owned parcel (located to the west of <br /> Dillard Road) to complete the connection from the Mount Baldy area to the Hult Ridgeline <br /> Park. <br /> • Center Way Connector: Provide a trail connection along the BPA power corridor between <br /> Dillard Road and Center Way. This trail would be a critical return route for mountain bikes if <br /> the headwaters trail is converted to an uphill only (one -way) mountain bike trail. <br /> • Donald Connector: Provide a trail connection from the existing headwaters trail, westward <br /> along the BPA power corridor and through the upper Donald Road neighborhood to the <br /> existing ridgeline trail. <br /> • Crest Connector: Provide a trail connection between the Crest Drive Elementary School <br /> and the planned ridgeline trail. <br /> • North Spencer Butte Trail: GROUP WILL DISCUSS IN APRIL <br /> B. Acquire land or access easements where needed and construct formal trail connectors to <br /> improve connectivity to the planned ridgeline trail system. Exact locations of connector trails will <br /> be determined by trail alignment and adjacent development activities. Key future connections in <br /> this area include: <br /> • Videra Park Connector: Provide a trail connection from the planned ridgeline trail to Videra <br /> Park and the adjacent neighborhood. <br /> • Bailey View Connector: Provide a trail connection from Bailey View Road to the planned <br /> ridgeline trail at the City owned Wild Iris Ridge site. <br /> • Skyview Connector: Construct a trail from Skyview Park to the planned ridgeline trail <br /> corridor to the south. This route may need to travel along sidewalks for some length. <br /> • Wild Iris Ridge to West Eugene Wetlands Connector: Provide a trail connection from the <br /> City owned Wild Iris Ridge site to the West Eugene Wetlands, the Fern Ridge Multi -use <br /> Path, and the planned West Eugene Wetland Education center on Danebo Road. This route <br /> may need to travel along sidewalks for some length to the south of Bailey Hill Road to avoid <br /> natural resource impacts and would cross West 11 Avenue at a signalized intersection. <br /> • Oak Hill Connector: Provide a trail connection from the BLM owned Oak Hill area to the <br /> Fern Ridge Multi -use Path at the Meadowlark Prairie overlook and parking area. <br /> • Greenhill Ridge Connector: Provide a connector trail along the ridgeline running between <br /> Greenhill Road and West 11 Avenue near the Lane Memorial Gardens cemetery. <br /> • Quarry Lane Connector: Provide a connector trail between the planned ridgeline trail and <br /> West 11 th Avenue/West Eugene Wetlands via the City owned Quarry Lane site. <br /> • Lane Community College Connector: Provide a trail connection from Lane Community <br /> College to the planned ridgeline trail and Bloomberg Park and Moon Mountain to the north. <br /> • Russel Creek Neighborhood Connector: Provide a trail connection from the Russel Creek <br /> neighborhood to Moon Mountain and the planned ridgeline trail (combine with LCC <br /> Connector). <br /> • Hendricks Park to Mount Baldy Connector: Provide a trail connection from Hendricks Park <br /> to Mount Baldy. The planned ribbon trail will connect Hendricks Park to 30 Avenue on City <br /> owned property when constructed. An on- street route along (Spring Boulevard) between <br /> Mount Baldy and 30 Avenue may be used to make the connection if a trail route cannot be <br /> secured, but an off - street trail route is preferred. <br /> • Laurel Hill to Moon Mountain Connector: Provide a trail connection from Laurel Hill Park <br /> and the surrounding neighborhood to Moon Mountain. This route may need to travel along <br /> sidewalks for some length. <br /> • Hendricks Park to Willamette River Connector: Provide a trail connection between <br /> Hendricks Park and the Willamette River multi -use path system. <br /> 5 <br />