New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Owen Rose Garden
COE
>
PW
>
POS_PWM
>
Parks
>
POS Director
>
Owen Rose Garden
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2014 10:21:41 AM
Creation date
8/6/2014 10:17:50 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
Identification_Number
Owen Rose Garden
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Owens (Summary) <br /> 25- Sep -95 <br /> Estimated Cost / <br /> Priority WorkType <br /> Percent of Total <br /> 0 Work must be <br /> completed this year <br /> Carpentry $21,980 <br /> 10.48% <br /> Custodial $3,000 <br /> 1.43% <br /> Electrical $8,500 <br /> 4.05% <br /> General Contractor $53,750 <br /> 25.62% <br /> Hazardous Material S350 <br /> 0.17% <br /> Mechanical $35,000 <br /> 16.68% <br /> Roofer $12,000 <br /> 5.72% <br /> Total for Priority: 0 $134,580 <br /> 64.15% <br /> 1 work must be <br /> completed within one <br /> year <br /> Carpentry $5,600 <br /> 2.67% <br /> Electrical $900 <br /> 0.43% <br /> General Contractor $31,450 <br /> 14.99% <br /> $9,500 <br /> Painting <br /> 4.53% <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.