POA GE ENGINEERING & SURVEYING, INC. <br /> October 27, 2004 <br /> City of Eugene <br /> Parks and Open Space <br /> Attn: Andrea G. Riner, Planning Manager <br /> 1820 Roosevelt <br /> Eugene, OR 97402 <br /> Re: Mallard Lake Estates First Addition, City Project #4226 <br /> Dear Ms. Riner: <br /> I have recalculated the city's portion of the Jessen Street improvements. The distribution of <br /> materials and their costs are documented on the enclosed map and cost analysis worksheets. The <br /> total cost amounted to $48, 272.80. Also, I am sending a copy of these pages to Ginger Perales in <br /> Engineering for her approval. <br /> Please feel free to call if you have any questions or comments. <br /> Sincerely, <br /> ( ; 15/ CA — W <br /> Matt Warren <br /> Enclosure l D ( 7 , 'r° cc: Dan Leahy <br /> Ginger Perales I ' <br /> •••Psr , <br /> d <br /> (30221tr3.wpd) <br /> CIVIL /ENVIRONMENTAL ENGINEERING n SURVEYING <br /> P.O. BOX 2527 EUGENE, OR 97402 -0152 990 OBIE ST. 541/485 -4505 FAX 541 /485 -5624 WWW.POAGE.NET <br />