Eugene Waterway <br /> Recreational and Environmental Enhancement Project <br /> Project Comparison <br /> 1.18.07 Key: • = High o = Low -- = None or n/a <br /> Canoe Canal Rec and Willamette River <br /> Habitat Millrace Dam Urban Corridor Rec <br /> Enhancements Modifications Study <br /> a <br /> i A Canoe Canal + MR Dam • • -- <br /> as <br /> as <br /> c B1, B2 Canoe Canal + MR Dam Alt's • • -- <br /> d - — -- <br /> C Canoe Canal Only • -- -- <br /> c D Millrace Dam Only • -- <br /> vo E Wil. River Rec. Study -- -- • <br /> Habitat • 0 <br /> N <br /> > W a t er • Quality • - <br /> y Stormwater 0 -- <br /> p Recreation • • • <br /> Public Safety 0 • 0 <br /> USACE • -- -- <br /> R L ODOT 0 o -- <br /> r . W illamalane PRD • • o <br /> a° co Y Springfield Cit of S rin field • i • o <br /> Eugene Parks Found. -- • o <br /> Public Involvement Moderate Moderate to High High <br /> (multi - jurisdictional) <br /> 1 <br /> Funding Options all 1,3,6( ?),7( ?) City only <br /> Funding Options <br /> City capital sources <br /> 1 POS - SDC's <br /> 2 WW -? <br /> 3 Bond <br /> 4 USACE (Metro Waterways Study) <br /> 5 WRDA Sec. 206 <br /> 6 HR 3475 <br /> 7 LWCF (OR ST. PARKS - LOCAL GOV.) <br /> 8 OWEB <br /> 9 NAWCA <br /> 10 WW GRANTS <br />