New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FEMA-DR-4169-OR PW:22 (Category B)
COE
>
PW
>
POS_PWM
>
Grants
>
Grant 101 - FEMA
>
FEMA-DR-4169-OR PW:22 (Category B)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 1:41:19 PM
Creation date
7/24/2014 1:41:12 PM
Metadata
Fields
Template:
COE_Contracts
COE_Contract_Number
2014-00409
COE_Contract_Document_Type
Correspondence
COE_Contract_Status
Active
COE_Contract_Organization
FEMA / OEM (Oregon Office of Emergency Management)
COE_Identification_Info
2014-00409
Department
Public Works
Contract_Administrator
Schafer
Contract_Manager
Risdal / Lankston
Document_Number
2014-00409
External_View
No
Permanent_Retention
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
06/04/2014 FEDERAL EMERGENCY MANAGEMENT AGENCY REC -01 <br /> 21:16:05 <br /> RECORD OF ENVIRONMENTAL CONSIDERATION (REC) <br /> Project ID: PA- 10 -OR- 4169 -PW -00022 <br /> Title: JC00010 Emergency Protective Measures <br /> NEPA DETERMINATION <br /> Non Compliant Flag: No EA Draft Date: EA Final Date: <br /> EA Public Notice Date: EA Fonsi Date: Level: STATEX <br /> EIS Notice of Intent Date: EIS ROD Date: <br /> Comments: City of Eugene, Lane County, City Hall, 1820 Roosevelt Blvd, GPS 44.0618, - 123.11919, Category B, <br /> Emergency Protective Measures, 100% complete. A severe winter storm occurring February 6 -10, <br /> 2014, brought a mixture of arctic air, strong east winds, and significant snowfall along with freezing rain <br /> and ice. The Applicant's Public Works Department, EOC, and call -taker staff used labor, materials, and <br /> equipment to receive calls and dispatch work crews for emergency work: work crews were out <br /> responding to trees down on roads, installing portable generators at the street lights to insure that they <br /> were working properly, assisingt the 911 center by answering phone calls, and dispatching fire <br /> department personnel to storm related calls including vehicle accidents, power lines down, falls from the <br /> ice and other emergencies due to the storm. No mitigation is eligible for Emergency Protective <br /> Measures. - jcarpen7 - 06/04/2014 19:29:19 GMT <br /> CATEX CATEGORIES <br /> Catex Category Code Description Selected <br /> No Catex Categories were selected <br /> EXTRAORDINARY CIRCUMSTANCES <br /> Extraordinary Circumstance Code Description Selected ? <br /> No Extraordinary Circumstances were selected <br /> ENVIRONMENTAL LAW / EXECUTIVE ORDER <br /> Environmental Law/ <br /> Executive Order Status Description Comments <br /> Clean Air Act (CAA) Completed Project will not result in permanent air <br /> emissions - Review concluded <br /> Coastal Barrier Resources Act Not Project is not on or connected to CBRA Unit <br /> (CBRA) Applicable or otherwise protected area - Review <br /> concluded <br /> Clean Water Act (CWA) Completed Project would not affect any water of the U.S. <br /> - Review concluded <br /> Coastal Zone Management Act Completed Project is not located in a coastal zone area <br /> (CZMA) and does not affect a coastal zone area - <br /> Review concluded <br /> Executive Order 11988 - Completed No effect on floodplain /flood levels and Emergency Assistance, as an emergency work <br /> Floodplains project outside floodplain - Review concluded Category B project, is exempt from floodplain <br /> review per 44 CFR 9.5(c)(1) except for <br /> permanent debris disposal. - jcarpen7 - <br /> 06/04/2014 19:21:08 GMT <br /> NOTE: All times are GMT using a 24 -hour clock. Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.