New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Ferry Street Bridge Viaduct Repairs Continue This Weekend
COE
>
PW
>
Admin
>
Public Affairs
>
2014
>
Ferry Street Bridge Viaduct Repairs Continue This Weekend
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2014 11:19:28 AM
Creation date
7/18/2014 11:19:26 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
Engineering
PW_Subject_Public_Affairs
Road Repairs
External_View
No
PWA_Release_Date
7/18/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br />July 18, 2014 <br /> <br />CONTACT: John Bonham, Project Manager, 541-682-5300 <br /> <br />From Public Information Section, 541-682-5523 or 541-954-2938 <br /> <br />FOR IMMEDIATE RELEASE <br /> <br />Traffic Advisory <br />Ferry Street Bridge Viaduct Repairs Continue This Weekend <br />Significant lane detours will begin at 7 p.m. today on the Ferry Street Bridge as paving repair work <br />continues through the weekend. <br />This weekend the work will focus on the northbound right lane of the roadway between the south end of <br />the bridge and the Fourth Avenue on- and off-ramps. Northbound traffic will be shifted to one of the lanes on the <br />west side of the bridge, and traffic across the bridge will be reduced to one lane in each direction. Saturday <br />afternoon, northbound traffic will be shifted back to the east side of the bridge, but only one lane will be open for <br />northbound traffic across the bridge. During work on the northbound lanes, the Fourth Avenue on- and off-ramps <br />will be closed. <br />All work will be completed and all lanes reopened by 6:15 a.m. Monday, July 21. <br />Motorists are cautioned to slow down, leave plenty of stopping distance and watch for signs as they <br />approach the lane detours. Use alternate routes if possible. <br />The following two weekends, July 25-28 and Aug. 1-4, the repair work will shift to the southbound lanes. <br />For more information about this and other major road-repair projects in the Eugene area, go to <br />www.keepusmoving.info or follow EugenePW on Twitter. <br /># # # <br /> <br />Public Works Administration ● City of Eugene ● 101 E. Broadway, Suite 400, Eugene, OR 97401 <br />Phone 541-682-8421 ● Fax 541-682-6826 ● www.eugene-or.gov/pw <br />
The URL can be used to link to this page
Your browser does not support the video tag.