HAMMITT Bob <br /> From: LYLE Les A <br /> To: HAMMITT Bob; WHITLOW Dave A; BREMER Richard B; BRETT Tom A; ANDERSEN <br /> Chris F <br /> Cc: RIKHOFF Greg S; NORRIS Linda H; WEILER Phil J <br /> Subject: Scobert Park <br /> Date: Thursday, September 26, 1996 4:04PM <br /> Here is the recommendation I'm getting from PW. Bob feels we should proceed with the alignment <br /> recommended by the committee or something very similar. He recommends this because it seems to be <br /> the only apparent consensus that has been reached by any group to date that is representative of multiple <br /> sides. He and his staff recommend the fence be located south of the bench on the west side and then <br /> follow the outside of the sidewalk and then end south of the bench on the east side (hope north is up). <br /> They recommend the material be the green plastic mesh that we typically use to protect trees in <br /> construction areas (usually orange). <br /> In the area were turf is needing to be restored to the north, they will use signs and will rope the area off. <br /> The signs will indicate the area has been reseeded and to please stay off. They will use a similar approach <br /> used in other parks for this type of routine maintenance. <br /> With respect to timing of some of the initial maintenance work, they are recommending going in and <br /> removing the dangerous elements of the playground and removing the stumps before roping off the areas <br /> to be reseeded. Since heavy equipment is required, doing this work first will avoid damage to the seeded <br /> area. The fencing along the sidewalk could go in on Monday unless a final decision by Linda occurs early <br /> on Friday. <br /> Applications for the committee are being prepared as I write this note. A display ad will go in the Guard on <br /> Saturday and other materials will be available either Friday or as late as Monday. Flyers will be displayed at <br /> various locations and direct mail will occur to owners in the area as well as the neighborhood group and <br /> other stakeholders. Deadline for the applications will be Monday Oct 7. <br /> So, need the feedback from PS perspective. Please let me know no later than mid - morning tomorrow. <br /> Bob, if we can get direction early, would you be able to set up the fencing on Friday? Thanks Les L <br /> Page 1 <br />