Table of Contents <br /> Page <br /> INTRODUCTION 1 <br /> PURPOSE 2 <br /> BRIEF PROJECT DESCRIPTION 2 <br /> HIGH WATER EVENT RESPONSE PROCEDURES 3 <br /> A. Storm Monitoring Program 3 <br /> B. Incident Management System 4 <br /> C. Emergency Command Center Operations 4 <br /> AVAILABLE RESOURCES 4 <br /> A. Personnel 4 <br /> B. Equipment, Materials and Supplies 5 <br /> C. Mutual Aid Agreements 6 <br /> D. State and Federal Agency Assistance 6 <br /> SAFETY 7 <br /> A. Safety Issues, Practices and Protocols 7 <br /> B. List of PPE and Other Equipment Specific to High Water Event Operations 8 <br /> PROJECT FEATURES and UNIQUE CONDITIONS 9 <br /> A. Specific Project Features 9 <br /> B. Access 10 <br /> 1. Routine Access 10 <br /> 2. Emergency Levee Access 11 <br /> C. Maps 12 <br /> Index Map 12 <br /> Map 1: Royal Avenue to Greenhill Road 13 <br /> Map 2: Greenhill Road west, north of Hillaire Street 14 <br /> Map 3: west of Hillaire Street to Fir Butte Road 15 <br /> Map 4: west of Fir Butte Road 16 <br /> ACTION PLAN 17 <br /> A. Pre - Flooding Emergency Actions 17 <br /> B. Waterway Monitoring and Levee Patrol 17 <br /> C. Staging Areas 18 <br /> D. Flood -Safe Pullback Areas 18 <br /> EMERGENCY EVACUATION NOTIFICATION 19 <br /> A. Responsibilities 19 <br /> B. Initiation Procedures 19 <br /> C. Pre - Emergency Flooding Incident Notification 20 <br /> Emergency Response Plan for Amazon Creek i September, 2008 <br /> P: \Cdocs\AP WARefDocs \E mergencyMgmt <br />