U6 /16 /UU 13:Z3 'X041 484 alD4 nnDD <br /> Eugene Water & Electric Board <br /> Cost Estimate Cc (0 /yr) U /e is 5 <br /> Estimate*: 378 Estimate Type: Service Unit of Work #: 21217 I - <br /> Estimate by: Bigelow, Christopher M <br /> Description: 2" pvc off centennial blvd for service to BMX track <br /> Customer • <br /> Phase Description Length Duantlty Amount <br /> 1 91651000 5/8" Water Meter Assembly 1 37 <br /> 1 91652110 3/4" Shrtsvc Off Pvc 1 113 <br /> 1 91653008 2" Pvc Off 8" Main 1 221 <br /> 1 9654222 Pipe,2 "pvc -200 Wht 800 1 304 <br /> Inventory Total: $675 <br /> Water Service, 3 Person 16 1,736 <br /> Water Engineering Tech II 4 164 <br /> Labor Total: $1,900 <br /> Water Systems Development Charge 1,800 <br /> Reimbursement Total: $1,800 <br /> Water Equipment for 3 Person Crew 16 183 <br /> Equipment Total: $183 <br /> Rock 100 <br /> Asphalt 250 <br /> Contract Labor 100 <br /> Fees And Licenses 165 <br /> Purchase Total: $615 <br /> Generated Labor Overhead 285 <br /> Generated General Overhead 236 <br /> Other Costs Total: $521 <br /> Total Estimated Cost: $5,694 0> I to()) <br /> PiriroA-rL: ,( <br /> trivD <br /> WlYT <br /> Printed: 06/26/20(6t: V168 <br /> . r\ >C■10/ t CIOD <br />