New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Department Strategic Planning
COE
>
PW
>
POS_PWM
>
Parks
>
General Parks Info
>
Department Strategic Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2014 11:50:52 AM
Creation date
7/10/2014 11:50:48 AM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Correspondence
PW_Division
Parks and Open Space
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Implement basin planning capital projects <br /> Implementing, manage or coordinate? County NPDES permit for SW within UGB <br /> and inside the City — River Road and Santa Clara <br /> Develop Open Waterways and SW development standards <br /> Manage impacts of evolving land use case law to regulatory function. <br /> Transportation <br /> Traffic Engineering and Operations <br /> • Maintenance <br /> • OPS <br /> • System Optimization <br /> Transportation planning and program <br /> • Long- range, CIP, Future Development — coordinate with engineering and <br /> PDD <br /> • Projects <br /> • Outreach and advocacy <br /> • Neighborhood traffic calming <br /> Key Focus <br /> Transportation service delivery review <br /> Manage major transportation planning projects (Transplan, CATS) with other <br /> agencies <br /> Updating tools and technology <br /> • Evolving to new method of street striping and overlays that last longer <br /> • Change out to green LED and other energy related projects <br /> • Utilize internet/ Web more to for outreach to improve access to information <br /> • Increase utilization of Signal systems and improve hardware and software <br /> Implement maintenance management information system <br /> • Coordinating with ISD to improve <br /> o Goal -to have a fully automated database for signs, strips, signals <br /> and records management <br /> Airport <br /> Expand airport to meet regional demands <br /> Access to airline industry <br /> • Recruit and retain carriers <br /> Increase economic development <br /> • Partnership initiatives <br /> o Provide facilities <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.